My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/21/1995
CBCC
>
Meetings
>
1990's
>
1995
>
2/21/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:10 PM
Creation date
6/16/2015 2:16:23 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/21/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br />On January 24, 1995, the Indian River County Board of County <br />Commissioners approved Resolutions 95-17 (Resolution I) and 95-18 <br />(Resolution II), which contained the preliminary assessment roll and <br />established the date of the public hearing for the subject project. <br />Property owners have been notified of the public hearing by <br />certified mail. Resolution 95-17 was published in the PRESS JOURNAL <br />on January 30, 1995. (See attached agenda item and minutes for the <br />above meeting.) <br />ANALYSIS <br />Design of the water distribution system is complete. Approval of <br />the attached Resolution III will confirm and approve the preliminary <br />assessment. <br />Informational meetings were held for the property owners on February <br />6, 8, and 13 at 7:00 p.m. in the County Commission Chambers. The <br />attached map displays the area to benefit from- the assessment <br />project. The project will generally serve the following described <br />areas: <br />Subdivision <br />-------- Unit---Lots---IDsLocation <br />---------------------- <br />Dixie Gardens 2 62 55 7th P1. SW, 7th -Ln SW, and <br />3rd Ct. SW west of Old Dixie, <br />7th Ln SW to 6th Ave. SW <br />Dixie Heights 1 thru 5 646 512 11th Ln SW to 17th St. SW, <br />2nd Ave SW to 5th Ave. SW <br />Piney Oaks SID 6 <br />Vero Lakes H-1, H-1 <br />6 <br />95th <br />St..(CR <br />512) to 89th <br />Estates <br />St., <br />100 <br />Ave. to 104th Ave. <br />Portions of One, A, B, 838 <br />608 87th <br />St. <br />from 90th Ave. (CR <br />C, H & H-3 <br />510) <br />to <br />98th Ave. to 89th <br />St. <br />to 104th <br />Ave. <br />Non -platted 28 <br />28 Various <br />throughout the above <br />Parcels <br />Totals 1,580 1,209 <br />The total estimated project cost of $2,903,410.11, less a <br />non -assessed Master Plan transmission main cost of $387,664.26, <br />results in a total estimated cost _to be assessed of $2,515,745.85, <br />The total estimated cost per square foot is $0.159061. This project <br />is to be paid through the assessment of property owners'along the <br />proposed water line route. In the interim, financing will be <br />through the use of impact fee funds. <br />Ninety-six and one half percent (96.5%) of the properties are <br />substandard or "undersized," according to Indian River County's <br />Comprehensive Plan and the County Public Health Unit, Division of <br />Environmental Health, which require that new lots utilizing well and <br />septic systems be a minimum of one-half acre. If served by a public <br />water system, the lot may be reduced to one-quarter acre in size. <br />Lots not meeting these minimum standards are cal.red "undersized <br />lots." <br />RECOMMENDATION <br />The staff of tlxe`•Department of utility Services recommends that the <br />Board of coat ." -commissioners _Commissioners approve the attached Resolution III. <br />Inch" F%W <br />Admin. <br />Budges <br />Utilities <br />Rick M4 <br />19 <br />February 21, 1995 Boa 94 FAuL 394 <br />
The URL can be used to link to this page
Your browser does not support the video tag.