My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/12/2017 (2)
CBCC
>
Meetings
>
2010's
>
2017
>
07/12/2017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2023 1:19:38 PM
Creation date
12/31/2019 11:01:49 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Workshop Meeting
Document Type
Agenda Packet
Meeting Date
07/12/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Based on the July 1 certified tax roll, the assessed value increased 7.4%; new construction added 1.9%, <br />while existing values increased 5.5%. The proposed millage rate for the M.S.T.U. Fund is 1.0733, which <br />is no change from the current year. This is 5.49% above the rolled back rate. <br />Transportation Fund <br />The recommended budget for the Transportation Fund is $15,588,761, reflecting an increase of $279,986 <br />or 1.8% (pages 33-34). Some of the major factors impacting the Transportation Fund Budget are <br />presented below: <br />• Staffing increase - 3 FT positions, $202,094; <br />• Increase in pipe and culverts - $60,000. <br />• Rolling stock/capital equipment - $690,220 reflecting an increase of $19,617 from the FY2017 <br />adopted amount. <br />As noted previously a Senior Civil Engineer and an Engineering Technician in County Engineering are <br />proposed to respond to demand in development review. <br />An Environmental Compliance Specialist is also proposed in the Stormwater Department at a cost of <br />$61,883 to optimize treatment performance of existing and proposed regional County stormwater <br />treatment facilities: Egret Marsh Stormwater Park (existing), PC Main . Screening System (existing), <br />Osprey Acres Floway and Nature Preserve (soon to be constructed), North Relief Canal Managed <br />Aquatic Plant System (under design). Current staffing needs additional support to operate and maintain <br />the two existing facilities, as well as the addition of Osprey Acres. <br />Due to aging infrastructure, there have been a number of culvert failures experienced recently. To <br />address this issue, funding for pipe and culvert materials was increased by $60,000. Addressing the <br />deferred maintenance will require a multi-year effort. <br />Constitutional gas taxes are budgeted to increase by $180,000 while County gas tax revenues reflect an <br />increase of $25,000. Transfers from the General Fund and M.S.T.U. will account for 65.6% of total <br />revenues next year compared to 63.7% for the current year. <br />• <br />• <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.