My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/12/2017 (2)
CBCC
>
Meetings
>
2010's
>
2017
>
07/12/2017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2023 1:19:38 PM
Creation date
12/31/2019 11:01:49 AM
Metadata
Fields
Template:
Meetings
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•ghlights of the FY2017/18 Budget: <br />• <br />• Tax roll Increase — 7.6% countywide, still well below peak. <br />• Sheriff funding — Requested $4.6M increase (all funds); recommended increase of $2.6M or 5.84%. <br />• Children's Services Funding — increase of $556,000 or 52.9%. <br />• Senior Resources Association (Transportation) increase of $200,000 or 25% and Senior Resources <br />Association (Senior Services) increased $123,000. <br />• Fire Rescue Station 14 - $1.9 million in additional operating costs for new station, inclusive of <br />startup costs to be funded by budget amendment this year so the station is fully operational in <br />October 2017 (17 total employees). <br />• Addition of five (5) positions to address building plan review response times including the following: <br />o a Deputy Building Official in the Building Fund support by building permit fees; <br />o a Lieutenant Inspector position in the Emergency Services District to improve fire plan <br />review response time; <br />o a Senior Civil Engineer and an Engineering Technician in County Engineering <br />(Transportation fund) to respond to increased demand for development review; <br />o A Senior Planner in the MSTU Fund to improve processing of development plans. <br />• Addition of three (3) positions to eliminate single source dependencies in key operational units <br />including: <br />o a Telecommunications Technician; <br />o a Natural Resources Manager; <br />o A Human Resource Payroll Specialist. <br />• Health Insurance - employer monthly contribution increase of $30; $20 monthly increase in <br />employee rates. ($499,320 county -wide impact). <br />• Construction of landfill Cell II, Segment 3 - $2,252,500. <br />• Facility Maintenance- includes funding for window sealing at the County Courthouse and pressure <br />washing and painting of the Courthouse and the Parking Garage and continue multi-year catch-up <br />on building maintenance and repairs. <br />• Full-time Position increases - $2,220,217- 32 BCC positions (19 for Fire Rescue), 33.92 FT <br />Constitutional, 65.92 total FT. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.