My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/01/2019
CBCC
>
Meetings
>
2010's
>
2019
>
10/01/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 12:41:05 PM
Creation date
1/7/2020 11:07:32 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/01/2019
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between. INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual <br />agree as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work <br />Documents. The Work is generally described <br />The proposed improvements to the intersect <br />Grand Harbor Boulevard consist of the signalizati.omof <br />arm assemblies which will be provided by the County,,, <br />furnished by the Contractor. Also included is mill <br />upgrades, signing and pavement markings, and \sod'din <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for whi <br />part is generally de <br />Name: I <br />Codnty;Project Nu <br />Bid Number:l201'9 <br />-18 <br />e <br />ed <br />hereinafter set forth, <br />in the Contract <br />of Indian RiverlBoulevard and <br />intersection by_installing mast <br />',all therappurtenances to be <br />and resurfacing, curb ramp <br />nents may be the whole or only a <br />.EVARD AND GRAND HARBOR <br />LIZATION <br />BOULEVARD VERO BEACH, FLORIDA 32967 <br />ARTICLE'3---ENGINEER \ <br />3.01 The Indian RivtCounty. Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER's representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 150TH calendar day after the <br />date when the Contract Times commence to run as provided in paragraph 2.03 of the <br />93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.