ARTICLE 7 - INDEMNIFICATION
<br />7.01 CONTRACTOR shall indemnify OWNER, ENGINEER, and others in accordance with
<br />paragraph 6.20 (Indemnification) of the General Conditions to the Construction Contract.
<br />ARTICLE 8 - CONTRACTOR'S REPRESENTATIONS
<br />8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the
<br />following representations:
<br />A. CONTRACTOR has examined and carefully studied the Contract Documents and the
<br />other related data identified in the Bidding Documents. 7-x
<br />B. CONTRACTOR has visited the Site and become familWNwith and' is) satisfied as to the
<br />general, local, and Site conditions that may affect cost, progress, and performance of the
<br />Work.
<br />C. CONTRACTOR is familiar with and is satisfied as fo\all\federal, state�and1ocal Laws and
<br />Regulations that may affect cost, progress; andperformance of the Work:,
<br />D. CONTRACTOR has carefully studied 'all: (1)) reports `of'explorations and tests of
<br />subsurface conditions at or contiguous to th\Site/and all drawings of,physical conditions in
<br />or relating to existing surface or subsurfacestru/ctures at or contiguous to the Site (except
<br />Underground Facilities) which have -,been identified in the Supplementary Conditions as
<br />provided in paragraph 4.02 of the General Conditions and (2) reports and drawings of a
<br />Hazardous Environmental Condition \if any�at the'Site which have been identified in the
<br />ndi
<br />Supplementary Cotionss as,provided'in paragraph 406 of the General Conditions.
<br />E. CONTRACTOR has obtained and�arefully studied (or assumes responsibility for having
<br />done so) all additional or supplementary examinations, investigations, explorations, tests,
<br />studies, and data concerning conditions (surface, subsurface, and Underground Facilities)
<br />at or contiguous to the Site which may affect cost, progress, or performance of the Work or
<br />which relate �to
<br />`any�aspect (of\the- means, methods, techniques, sequences, and
<br />procedures of constructiori-to be, employed by CONTRACTOR, including applying the
<br />specific means, methods, techniques, sequences, and procedures of construction, if any,
<br />expressly__cequ�ed by\the Contract Documents to be employed by CONTRACTOR, and
<br />safety precautions and programs incident thereto
<br />F. CONTRACTOR 'does not consider that any further examinations, investigations,
<br />explorations, ts, studies, or data are necessary for the performance of the Work at the
<br />Contract Price, within the Contract Times, and in accordance with the other terms and
<br />conditions of the Contract Documents.
<br />G. CONTRACTOR is aware of the general nature of work to be performed by OWNER and
<br />others at the Site that relates to the Work as indicated in the Contract Documents.
<br />H. CONTRACTOR has correlated the information known to CONTRACTOR, information and
<br />observations obtained from visits to the Site, reports and drawings identified in the
<br />Contract Documents, and all additional examinations, investigations, explorations, tests,
<br />studies, and data with the Contract Documents.
<br />96
<br />
|