My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/01/2019
CBCC
>
Meetings
>
2010's
>
2019
>
10/01/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 12:41:05 PM
Creation date
1/7/2020 11:07:32 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/01/2019
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00530 — EJCDC STANDARD FORM OF AGREEMENT <br />BETWEEN OWNER AND CONTRACTOR ON THE BASIS OF A STIPULATED PRICE <br />Roseland Elevated Storage Tank Water Transmission Main <br />THIS AGREEMENT ("Agreement" or "Contract"), dated the day of in the year <br />2019 by and between Indian River County, a political subdivision of the State of Florida (hereinafter <br />called OWNER) and .(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as <br />follows: <br />ARTICLE 1 WORK <br />CONTRACTOR as an independent contractor and not as an employee shall furnish and <br />complete all of the necessary labor, material, and equipment to perform the work as specified <br />or indicated in the Contract Documents and per FDEP, Indian County Department of Utility <br />Services (IRCDUS) and County Engineering Department standards. The work is generally <br />described as follows: <br />Construction of a new potable water transmission main and modifications to the existing <br />potable water distribution system at the Roseland Elevated Storage Tank (EST) site. Work <br />includes, but is not limited to, modifications to the existing water mains, construction of a <br />12 -inch water transmission main to the Roseland EST and pump station (by others), site <br />work, appurtenances and all other improvements as shown on the contract plans <br />necessary to make a fully functional and complete working system. <br />The Contractor shall submit a Traffic Control Plan to the County Traffic Engineering <br />Division a minimum of 72 hours prior to construction and notify County Traffic Engineering <br />a minimum of 24 hours before any lane closures. A temporary access plan shall be <br />provided indicating how local traffic will be maintained if the existing road is removed and <br />reconstructed. Stand mounted Advance Construction signing shall be installed in <br />accordance with FDOT Index 602. One lane closures shall be in accordance with FDOT <br />Index 603. When any work encroaches the area between the centerline and two (2) feet <br />outside the edge of pavement, traffic shall be restricted to a single lane. <br />ARTICLE 2 ENGINEER <br />The Roseland Elevated Storage Tank Water Transmission Main has been designed by Kimley-Horn <br />and Associates, hereinafter called ENGINEER, and who is to act as OWNER'S representative, assume <br />all duties and responsibilities and have the rights and authority assigned to ENGINEER in the Contract <br />Documents in connection with completion of the work in accordance with the Contract Documents. <br />ARTICLE 3 CONTRACT TIME <br />3.1 The CONTRACTOR shall be substantially completed with the following timeframe <br />(a) Within 15 calendar days from effective date of Notice to Proceed, Contractor shall <br />complete the following tasks: <br />Obtain all necessary permits. <br />63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.