Laserfiche WebLink
ORDER NO. PSC -2019 -0360 -TRF -EI <br />DOCKET NO. 20190081 -El <br />PAGE 8 <br />Attachment A <br />Page 1 of 7 <br />Twenty-SkO Seventh Revised Sbect'Nn, 6.095 <br />FLORIDA POWER & LIGHT COMPANY Cancels Twenty-Fiftl Sl%th Revised Shect'No. 6.095 <br />(Continued firm Sheet No. 6.090) <br />10.2.9,15 <br />If the Applicant installs the permanentelectricservice entrance such that HL''s-service lateralcanbe subsequently <br />installed and utilized to provide that building's construction service, the Applicant shall receive a credit in the <br />amount of $64M70_taper se vice. lateral, subject to the following requiintincntg: <br />a) 'fIJGs must be inspected and approved by the local inspecting authority. <br />b). All service laterals within the subdivision must be installed as'TUGs. <br />c) U111, must lie able to install the service latemi, enctgi7t die service lateral, And set die meter to energize lite <br />load side of the meter can, all in a single trip. Subsequent visits other thiin routine maintenance or meter <br />readings will void the credit. <br />d) 'I'hcrcatlei, acceptance and receipt of service by the Customer shall constihde certificnticn that the <br />Customer has met all inspection requirements, complied with till applicable codes and rales and, subject to <br />section 2,7Indemnity to Company, or section 2.71 Indemnity to Company-- (Governmental, FPL's <br />General Rules and Regulations, the Customer releases, holds harinless and agrees to indemnify the <br />Company from anti against loss or liability in connection with the provision o€electrical services to or <br />through such Customer -owned electrical installations. <br />e) The Applicant shall be held responsible for all electric service used untWthe account is established in the <br />succeeding occupant's name. <br />This credit applies only when ITL installs the service - it does not apply when the applicant installs the service <br />conduits, or the service conduits and cable. <br />10.2.9. Location ofokh-Amtion Facilities <br />Underground distribution facit.itics will be located, as determined by rte Company, to maximize their accessibility for <br />maintenance and operation. The Applicant shall provide accessible locations for meters when the design of a dwelling <br />unit or its appurtcnaaices limits perpetual accessibility for reading, testing, or mnlcing necessary repairs and adjustments. <br />10.2.10. Special C:onditiotrs <br />The costar quotcd in these rules are based on conditions which permit. employment of rapid construction techniques. <br />The Applicant shall be responsible for necessary additional hand digging expenses other than what is annually <br />provided by the Company. The Applicant is responsible for clearing, compacting, boulder and large rock removal, <br />stump removal, pavin., and addressing other special conditions. Should pavhtg, grass, landscaping or sprinkler <br />systems be installed prior to the construction of die underground distribution facilities, the Applicant shall pay the <br />added costs of trenching and baokfilling and he responsible for restoration of property damaged to accommodate the <br />installation ofunderground facilities. <br />10.2.11. pgiigofTJcliviiry <br />Tile point of delivery shall be detcnniocd by.the Company and will normally be at,or near the Imt i of the building <br />nearest the point at which the secondary chxnie supply is available to- the property_ When a location for a point of <br />delivery different from Unit designated by the Company is requested by the Applicant, and approved by the Company, <br />the Applicant shall pay the estimated foil cost ofservice lateral length, including labor and materials, required in excess <br />of that which would have been needed to reach the Company's designated point of service. The additional cost per <br />trench foot is $a 30 1, Whcrc nn existing; trench is utilized, the additional cost per trench foot is V-79.1,40. Where <br />the. Applicant provides the trenching, installs Company provided conduit according to Company specifications and <br />hadcfillinp, the cost per additional trench foot is $3:02 ?J`i� Any reAcsigriation requested by die Applicant shall <br />cunfonn to good safety and construction practice's as determined by the Company. Service latcrais shall he Installed, <br />where possible, in a direct line to the point of delivery. <br />(Continued oilSihect No. 6,096) <br />Usued by: �"AtomioTiffar� ' C tt hear, Director, Rates and Tariffs <br />Fft'ectivct 00aber-14110446 <br />M <br />