My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/10/2019 (2)
CBCC
>
Meetings
>
2010's
>
2019
>
09/10/2019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 12:12:44 PM
Creation date
1/7/2020 12:06:22 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/10/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2019 -0360 -TRF -EI <br />DOCKET NO. 20190081 -EI <br />PAGE 16 <br />FLORIDA POWt R & LJGI I' CONTPAW <br />(Confiuued from Sheen'%. 6,520) <br />Attachment B <br />Page 2 of 3 <br />4te4 tP]tvcnth Revised Shect. No. 6.530 <br />cancels N4nt tenth Revised Sheet No. 6.530 <br />e) P -ary splice box including splicex and cable pulling set-up. <br />-1)=Sinrle Phase - per box <br />2)'1`wo Phaco - Ilcr box 54•<SS9a461 hGt-91 <br />3) Thme Phase - rex box S1gA'L� k31:3bi.+Ex <br />f) Additional instailation charge fer undergroundprimarylaterals including trench and cable -in -conduit which exceed the <br />limits.set in 13.2.12 a). <br />1)Single Pimse _ per toot S (o -I _Q - <br />2) Two Phase - per foot. i ;1-243_02 <br />3) Thi ee Phase - per foot <br />g) Additional installation cbarge fur i:udcrground primary laterals including lmrch and ,cable: 'va-Conduit extended beyond the <br />Company designated point, of dclivcry to a remote paint of delivery. <br />1) SingleThase- pertool. <br />2) TwoPhase - per .foot S 4,Mt:1jLH <br />3) Three Phage • per foot $ 4 a41 29. <br />h) The above Wate Arc based upon arrangementss that will perutit serving thr local undcrimound dastribution s3yAcm within the <br />cotmnerciatlindusuial development from overhead feeder imun,�. If feedermaiu within the coumerciabinduatsivi <br />development arc deemed ncccssary by the tympany to ilruvidc andlor maintain LAcynrue service and art: mquited by the <br />Appliea.ni. of a. guminniental agency to be installed underground, the .Applicant Shall pay the company 0w average <br />differential Cost betwW1 such underground iecdcr main& within the: eaminercialfindustrialdeveJopnimt and ctluivolent <br />oVe{tcad fce(fer r:utiiis, ns 7'<Iliotva: - <br />Applicaw's <br />Contribution <br />Cost per fault offcrdrr treneb within the con ntereW!'indu&trial <br />&Vdi'pmunt (excluding s+'itches) 6 310-0 <br />Cusf (ler aboyo "'fund nxdtnountcd swv.tch package $P444-4325.71 h,E,t <br />i) The Company will proviole, Inc aiandbylassistance appointnxnt at noadditional ehirl;e to the. Applicant addinnow <br />addltiuftal- load Co aSSi't With tnStallutlon of the Applacit.-rt's condoclurS and iYlndvit(s) into a padinouated n'ang-Sfnrm£rn1 <br />. <br />pedestal or vault (not to exceedfour hours in duration) dating gorrual boors of operation. Additional appointments wifl ho <br />provided upon rc,lumr., at the, A.pplicaht's expense. <br />(Continued on Sheat 6.540) <br />Issuedby: Vii?-1��tti 'Ctffany (:ohert, Director, ]rates nnd'I'arifis <br />Effective: 009be4, W, 201�i <br />�G. Lo -lav <br />
The URL can be used to link to this page
Your browser does not support the video tag.