Laserfiche WebLink
11/12/2019 Item 12.F.1. <br /> Which Drains? <br /> • Stormdrains that have decent foot <br /> traffic will be targeted for this project. <br /> • City of Vero is very interested in being <br /> included. GOAL: <br /> • City of Sebastian has a new mural <br /> project starting with Chamber of To create a <br /> ommerce- Staff was directed by City system of themed <br /> Staff to reach out to the Chamber. <br /> drains all along <br /> • Town of Indian River Shores has yet to our IRC portion <br /> respond. <br /> of the Lagoon. <br /> Drain Art Process: <br /> 1. Volunteer artists send applications and designs to Linda Moore, <br /> President of DVBMP for determination of artistic quality and <br /> originality. <br /> 2. IRC Stormwater will coordinate with municipalities for final <br /> approval of applicants and designs as well as assigning <br /> stormdrains. <br /> 3. A series of Saturdays will be selected for "Project Painting Days." <br /> 4. Crystal Ploszay, with Unicorn Epoxy, will prepare the stormdrains <br /> for artwork. <br /> ' ! f- ,. .. : <br /> 25 5 <br />