Laserfiche WebLink
Lucie may reject the Load if Indian River fails to respond to St. Lucie's e-mail within four(4) <br /> hours or fails to inspect the Load within the timeframes described in this Section 5. <br /> 6. If Indian River's Manager or designee inspects the Load and disagrees with St. Lucie's <br /> determination, the representatives of Indian River and St. Lucie shall work together in good faith <br /> and thereby attempt to resolve their differences informally. In such cases, St. Lucie shall be <br /> bound by the requirements contained herein, including but not limited to the 25%threshold for <br /> Excessive Amounts of Non-Conforming Material, but St. Lucie shall retain the exclusive <br /> authority to decide whether it will accept or reject the Load at its Facility. <br /> • <br /> 157 <br />