My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-002
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 3:17:52 PM
Creation date
1/16/2020 4:07:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/07/2020
Control Number
2020-002
Agenda Item Number
8.H.
Entity Name
Kimley-Horn and Associates
Subject
Work order for Moorhen Marsh Headworks Structural Services
Area
Moorhen Marsh
Project Number
IRC-1909
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK ORDER NUMBER 30 <br />Moorhen Marsh Headworks Structural Services <br />Project Number: IRC -1909 <br />This Work Order Number 30 is entered into as of this 7th day of January , <br />20 20, pursuant to that certain Continuing Consulting Engineering Services Agreement for <br />Professional Services entered into as of this 1711 day of April, 2018 (collectively referred to as <br />the "Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the State <br />of Florida ("COUNTY") and KIMLEY-HORN AND ASSOCIATES, INC. ("Consultant"). <br />The COUNTY has selected the Consultant to perform the professional services set forth on <br />Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this reference. <br />The professional services will be performed by the Consultant for the fee schedule set forth in <br />Exhibit B (Fee Schedule), attached to this Work Order and made a part hereof by this reference. <br />The Consultant will perform the professional services within the timeframe more particularly <br />set forth in Exhibit C (Time Schedule), attached to this Work Order and made a part hereof by <br />this reference all in accordance with the terms and provisions set forth in the Agreement. <br />Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order shall conflict <br />with the terms of the Agreement and the terms of the Agreement shall be deemed to be <br />incorporated in each individual Work Order as if fully set forth herein. <br />EXHIBIT A — SCOPE OF WORK <br />Moorhen Marsh Structural Services for Remaining Structures <br />The COUNTY is designing the Moorhen Marsh Leaps treatment facility in-house and has <br />requested structural design services for the remaining structures on the project. Structural <br />services for the headworks structure were completed under a previous work authorization. The <br />requested structural design services are limited to the preparation of construction drawings <br />and specifications for the remaining structures listed below: <br />• Water Lettuce Scrubber Access Ramp <br />• Water Lettuce Scrubbers Floor Slab <br />• Water Lettuce Scrubber Dewatering Flume <br />• Water Lettuce Sludge Collection Pit <br />• Water Lettuce Scrubber Equipment Access <br />• Water Lettuce Scrubber Weir Structure <br />• Algal Reaeration Floor Slabs <br />• Final Settling Basins Retaining Walls <br />• Sludge Storage Areas <br />1IPage <br />
The URL can be used to link to this page
Your browser does not support the video tag.