My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-002
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 3:17:52 PM
Creation date
1/16/2020 4:07:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/07/2020
Control Number
2020-002
Agenda Item Number
8.H.
Entity Name
Kimley-Horn and Associates
Subject
Work order for Moorhen Marsh Headworks Structural Services
Area
Moorhen Marsh
Project Number
IRC-1909
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. 30 <br />Moorhen Marsh Headworks Structural Services <br />• Composting Areas <br />• Structures S8, S9, S11, and S12 <br />Task 1— Structural Design Services <br />The structural services are limited to the following list of components: <br />• Concrete elements of the above listed structures <br />• Aluminum grating support structures at the applicable above listed structures <br />• Aluminum handrail design at the applicable above listed structures <br />The structural drawings for the above listed structure will be a component set of the overall <br />project plan set and will consist of the following elements: <br />• Additional general notes and material specifications <br />• Structural Plan Views <br />• Structural sections <br />• Structural details, including typical joints <br />• Handrail details <br />• Grating support details <br />Design shall be performed in accordance with current Florida Building Code criteria, <br />supplemented by ACI. <br />Deliverable will consist of structural plan sheets, inclusive of specifications as notes on the <br />plans, to be incorporated into the overall set of construction plans being prepared by the <br />COUNTY. <br />This scope assumes there will be only two submittals to the COUNTY: at the 90% stage and at <br />the 100% stage. <br />Task 2 — Coordination and Meetings <br />The consultant will coordinate with up to one slide gate and aluminum stop log manufacturers. <br />The consultant will attend up to two meetings with the COUNTY. The first meeting (kickoff <br />meeting) shall occur upon NTP to verify layout and design criteria for the above listed <br />structures. The second meeting will take place upon receipt of 90% submittal comments. <br />Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.