My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-002
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 3:17:52 PM
Creation date
1/16/2020 4:07:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/07/2020
Control Number
2020-002
Agenda Item Number
8.H.
Entity Name
Kimley-Horn and Associates
Subject
Work order for Moorhen Marsh Headworks Structural Services
Area
Moorhen Marsh
Project Number
IRC-1909
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Order No. 30 <br />Moorhen Marsh Headworks Structural Services <br />Additional Services <br />Any other services, including but not limited to the following, are not included in the <br />Agreement. <br />1. The above listed structures in configuration other that the initial configuration provided <br />by the COUNTY at or before the kickoff meeting. <br />2. Structural services associated with the precast structures and pole barn or building <br />structure <br />3. Structural Service for the Miscellaneous Work Slabs, Dumpster Pad, and other slabs on <br />grade not listed above. <br />4. Design and details for aluminum or stainless-steel hatches <br />5. Additional meetings <br />6. Bid assistance <br />7. Construction Phase Services <br />Any services not specifically provided for in the above scope of work will be billed as additional <br />services at our then current rates. <br />Information Provided By Client <br />We shall be entitled to rely on the completeness and accuracy of all information provided by <br />the COUNTY or the COUNTY's consultants or representatives. The COUNTY shall provide all <br />information requested by the Consultant during the project, including but not limited to the <br />following: <br />1. Geotechnical information <br />2. COUNTY's AutoCAD files <br />Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.