Laserfiche WebLink
Work Order No. 30 <br />Moorhen Marsh Headworks Structural Services <br />EXHIBIT C—TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, final design documents are expected <br />to take approximately eight (8) weeks from the Notice to Proceed (NTP). <br />NTP <br />Interim Submittal (90% Design Drawings) <br />Final Submittal (100% Design Drawings) <br />contingent upon BOCC approval <br />6 weeks following NTP <br />2 weeks following 90% comments <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />Page 5 of 6 <br />