Section 02731 <br />Irrigation Water Well <br />A. Set casing plumb and true to line. Tests for plumbness and alignment must be made <br />after construction of well and before its acceptance. Additional tests however, may be <br />made during performance of work. <br />B. Test alignment of well by lowering into well, to a depth of 75', a section of pipe <br />approximately 40' long. Provide outer diameter of pipe not more than 1/2" smaller than <br />diameter of that part of casing or hole being tested. <br />C. Well casing shall not be out of plumb more than 2/3 of the diameter of the casing per <br />100' of length. <br />3.8 Testing well for yield and draw down <br />A. After the well has been constructed and cleaned out, the depth of well accurately <br />measured, conduct final pumping tests. <br />B. Provide a variable capacity test pump with minimum capacity of maximum expected <br />yield at a total head equal to draw down in well, plus head loss in pump column and <br />discharge pipe. <br />C. Provide necessary discharge piping for pumping unit to conduct water to a point of <br />disposal so as to avoid a nuisance or endanger adjacent property. <br />D. Provide and maintain equipment of adequate size and type for measuring flow of <br />water, such as weir box, orifice or water meter. <br />E. Measure elevation of water level in well. <br />F. Provide labor, motive power and other necessary materials, equipment and supplies <br />required to operate pumping unit. <br />G. After test pump and auxiliary equipment have been installed, make arrangements for <br />conducting pumping test and notify Owner and Architect 3 -days prior to starting test. <br />1. Note water level elevations, referred to an assigned datum in well. <br />2. Start test pump and adjust pumping rate as necessary. <br />3. Record readings of water level in well and pumping rate at 30 -minute intervals. <br />4. Take water samples for analysis at the beginning and the ending of the pump test. <br />H. Final testing for each well to consist of 4 -hours of continuous pumping after reaching <br />maximum draw down. <br />1. After completion of final test, remove by necessary means any sand, stones or <br />other foreign materials from the in well. <br />I. Upon completion of pumping test, record returning water levels in well for a sufficient <br />period, at timed 15 minute intervals, to achieve 95% recovery, so that a curve of the <br />recovery rate of the well may be plotted. <br />J. Provide all test results and other required submittals to the Owner and Architect prior to <br />installation of the pump. <br />3.9 Unit prices for well construction <br />A. Bid all well work as indicated on the drawings and described in these specifications. <br />The base bid shall be based upon the well being 140' deep, with 20' of stainless steel <br />screen, and 120' of 6" casing. The Contractor shall submit the following unit price <br />items and they shall govern additions to or deductions from quantities included in Base <br />Bid for work under this section. <br />1. Cost per foot of drilling. <br />2. Cost per foot of casing (in place). <br />State Road 60 and 431 Avenue <br />