Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and Timothy Rose Contracting, Inc. <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The project will consist of the reconstruction and widening of the intersection <br />of SR 60 and 43rd Avenue and the widening of the existing bridge over the Main Relief <br />Canal. Drainage improvements will consist of structures, piping and retention areas. <br />Concrete sidewalks, 5' wide and 6' wide, will be constructed, utility relocations will be <br />performed, landscaping, traffic and pedestrian signals, lighting and pavement markings <br />will be installed. Earthwork, erosion control and maintenance of traffic will also be <br />performed. This is an F.D.O.T. County Incentive Grant Program (CIGP) funded project <br />FM No. 431759-2-54-01. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: SR 60 and 43rd AVENUE INTERSECTION IMPROVEMENTS <br />County Project Number: IRC -0853 <br />F.M. No. 431759-2-54-01 <br />Bid Number: 2019073 <br />Project Address: Intersection of SR 60 and 43rd Avenue' <br />Vero Beach, Florida 32960 8r 32966 <br />ARTICLE 3 — ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER's representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT -TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />00520-2 00520 - Agreement (Public Works) REV 06-14.doc <br />H:\Bids\2018-2019 FY (2019000)\2019073 SR 60 and 43rd Ave Intersection Improvements\00520 - Agreement (Public Works) REV 06-14.doc <br />