Bid Number 2019073 <br />Addendum No. 2 <br />Page 2 of 3 <br />Answer 7. See answer to Question 3. <br />Question 8. Can the CAD files be provided for this project? <br />Answer 8. CAD files will not be provided to bidders. <br />Question 9. What is the engineers estimate for this project? <br />Answer 9. See answer to Question 1. <br />Question 10. During Mandatory Pre -Bid meeting on 09/18, it was mentioned some documents <br />and answer to questions to be available to bidders via addendum. <br />Please provide us: <br />a. Project Budget? <br />Answer 10 a. See Prebid meeting minutes <br />b. CAD Files? (we can sign a disclaimer document) <br />Answer 10 b. CAD files will be provided to the successful bidder. <br />c. Better pdf's plans? (actual version is ineligible scanned copies) <br />Answer 10 c. Vectorized pdf's will be provided. <br />d. MOT Plans sheets? <br />Answer 10 d. MOT is the responsibility of the successful bidder. See meeting minutes. <br />e. Summary of Quantities plans sheets?' <br />Answer 10 e. Vectorized PDF's will be provided. <br />f. Bid Form in Excel Version <br />Answer 10 f. Excel file will be provided. <br />g. Utility Work Schedule (by others) affecting the Area. <br />Answer 10 g. Included in Addendum <br />h. Who is going to be the CEI for this project? — <br />Answer 10 h. Consor Engineers, LLC. <br />8. There is no project control sheet. There are no control points on this project giving us northing and eastings, <br />or no coordinates on the baseline. These are needed in order for us to tie this down to the state plane and <br />use our GPS more accurately. is the county able to provide more information? <br />9. 1 could only find 4 benchmarks, and they are all on SR60 pretty close to each other. If we are to run <br />this bench out, this leaves more room for error and nothing to tie the elevations down as we extend <br />out past the given benchmarks. Is the County able to provide more information? <br />10. 1 noticed that there are side streets that have baselines, but on those baselines, there are no bearings or <br />distances. On these side street baselines, they give call outs for us to build, but with no way to construct the <br />baselines, these call outs do not help us any. Is the County able to provide more information? <br />Answer 8,9, 1.0 Survey Control plans will be provided to the successful Bidder. <br />B:\2018-2019 FY (2019000)\2019073 SR 60 and 43rd Ave Intersection Irnprove ments\add end urn 2\Addendum 2.docx <br />