Laserfiche WebLink
agreement.docx Addendum 3 <br />CONTRACTOR, including applying the specific means, methods, techniques, sequences, and <br />procedures of construction, if any, expressly required by the Contract Documents to be employed <br />by CONTRACTOR, and safety precautions and programs incident thereto. <br />E. CONTRACTOR does not consider that any further examinations, investigations, explorations, tests, <br />studies, or data are necessary for the performance of the Work at the Contract Price, within the <br />Contract Times, and in accordance with the other terms and conditions of the Contract Documents. <br />F. CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the <br />Site that relates to the Work as indicated in the Contract Documents. <br />G. CONTRACTOR has correlated the information known to CONTRACTOR, information and <br />observations obtained from visits to the Site, reports and drawings identified in the Contract <br />Documents, and all additional examinations, investigations, explorations, tests, studies, and data <br />with the Contract Documents. <br />H. CONTRACTOR has given OWNER written notice of all conflicts, errors, ambiguities, or discrepancies <br />that CONTRACTOR has discovered in the Contract Documents, and the written resolution thereof <br />by OWNER is acceptable to CONTRACTOR. <br />I. The Contract Documents are generally sufficient to indicate and convey understanding of all terms <br />and conditions for performance and furnishing of the Work. <br />ARTICLE 8 - CONTRACT DOCUMENTS <br />8.01 Contents <br />A. The Contract Documents consist of the following: <br />(1) This Agreement (pages 1 to 9, inclusive); <br />(2) Notice to Proceed <br />(3) Public Construction Bond (pages 39 to 42, inclusive); <br />(4) Certificate of Liability Insurance <br />(5) Invitation to Bid 2020017 <br />(6) Construction plans titled JONES PIER WETLAND RESTORATION AND CONSERVATION <br />IMPROVEMENTS PHASE 1 dated 10-28-2019 prepared by MBV Engineering, Inc. (sheets C1 <br />through C16, inclusive) <br />(7) Construction plans titled BOARDWALK PLANS FOR JONES' PIER CONSERVATION AREA PHASE 2 <br />WETLAND ENHANCEMENT AND CREATION PROJECT dated 7-29-2019 prepared by DANSCO <br />Engineering, LLC (sheets CS and S1 through S3 inclusive) <br />(8) Construction plans titled JONES' PIER CONSERVATION AREA PHASE 2 WETLAND ENHANCEMENT <br />AND CREATION PROJECT dated 11-07-2019 prepared by Carter Associates, Inc. (sheets C-000, <br />S-100 and C-100 through C-112 inclusive) <br />(9) JONES' PIER CONSERVATION AREA RESTROOM BUILDING dated 02-05-2019 prepared by <br />Donadio Associates, Inc. (sheets 1 through 18 inclusive) <br />