My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/05/2019 (2)
CBCC
>
Meetings
>
2010's
>
2019
>
11/05/2019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 12:31:10 PM
Creation date
2/6/2020 12:26:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/05/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County, Florida S'k <br />Department of Utility Services <br />Board Memorandum <br />Date: October 24, 2019 <br />To: Jason E. Brown, County Administrator <br />From: Vincent Burke, PE, Director of Utility Services <br />Prepared By: John M. Boyer, P.E., Utilities Engineer <br />Subject: Work Order No. 7 for Masteller & Moler, Inc., 8th Street 24" Force Main Relocation <br />FDOT Project 437717-1 <br />Background: <br />The Florida Department of Transportation (FDOT) is in the design phase of the replacement of the 8th <br />Street (CR 612) Bridge at 741h Avenue. The project will impact an existing Indian River County Department <br />of Utility Services (IRCDUS) sewer utility along the 8th Street right of way. IRCDUS recommends hiring <br />Masteller & Moler, Inc. (MM) to prepare a utility relocation design. <br />Analysis: <br />On April 17, 2018, the Board of County Commissioners (BCC) approved the Continuing Contract <br />Agreement for Professional Services with MM. In accordance with that agreement, MM will provide <br />professional services to prepare Engineering Design Plans and Specifications. <br />Funding: <br />Funds for this project are derived from operating capital funds. The operating fund budget is derived from <br />water and sewer revenues. <br />Description <br />Account Number <br />Amount <br />8th Street 24" Forcemain Relocation <br />471-169000-20502 <br />$ 53,540.00 <br />Recommendation: <br />Staff recommends the Board of County Commissioners approve Work Order No. 7 with Masteller & Moler, <br />Inc., for a lump sum amount of $53,540.00. <br />Attachments: <br />1. Work Order No. 7: Masteller & Moler, Inc. <br />176 <br />
The URL can be used to link to this page
Your browser does not support the video tag.