My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/05/2019 (2)
CBCC
>
Meetings
>
2010's
>
2019
>
11/05/2019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 12:31:10 PM
Creation date
2/6/2020 12:26:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/05/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County, Florida T <br />Department of Utility Services <br />Board Memorandum <br />Date: October 30, 2019 <br />To: Jason E. Brown, County Administrator <br />From: Vincent Burke, PE, Director of Utility Services <br />Prepared By: John M. Boyer, P.E., Utilities Engineer <br />Subject: Utility Work by Highway Contractor Agreement with FDOT for the Adjustment of Valve <br />Boxes and Manhole Rims on Highway A1A <br />Background: <br />Florida Department of Transportation (FDOT) is planning to resurface a portion of Highway A1A/Tides <br />Road from North of SR 60 to North of CR 510. The subject project is scheduled to begin in the spring of <br />2020. The county's existing water, sewer and reuse valve boxes and manhole rims will be in conflict with <br />the proposed roadway improvements and will need to be adjusted. <br />Analysis: <br />Indian River County Department of Utility Services staff is of the opinion that the subject work be <br />performed by the same contractor doing the roadway improvements. Therefore, staff requested FDOT <br />prepare an agreement where the utility relocation/adjustment work will also be performed by the <br />prospective highway contractor. Section 3 of the agreement states the initial estimate of the cost of the <br />utility work is $21,745.00. <br />Funding: <br />Funding forthe utility valve box and manhole rim adjustment is available in the Renewal and Replacement <br />budget in the Utilities operating fund. The Utilities operating fund budget is derived from water and sewer <br />revenues. <br />Description <br />Account Number <br />Amount <br />A1A Valve Adjustments <br />47123536-044699-20503 <br />$21,745.00 <br />Recommendation: <br />Staff recommends the adoption of the Resolution regarding Utility Work by Highway Contractor <br />Agreement for the Relocation/Adjustment of Water, Sewer and Reuse Valve Boxes and Manhole Rims for <br />the FDOT Project #438042-1 Highway A1A/Tides Road from North of SR 60 to North of CR 510 and <br />approval of the FDOT — Utility Work by Highway Contractor Agreement. <br />Attachment(s): <br />1. Resolution -Utility Work by Highway Contractor Agreement for the Relocation/Adjustment of <br />Water, Sewer and Reuse Valve Boxes and Manhole Rims for the FDOT Project #438042-1 <br />Highway A1A/Tides Road from North of SR 60 to North of CR 510. <br />2. FDOT -Utility Work by Highway Contractor Agreement. <br />IM <br />
The URL can be used to link to this page
Your browser does not support the video tag.