My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-018
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 3:20:10 PM
Creation date
2/11/2020 12:20:15 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
02/04/2020
Control Number
2020-018
Agenda Item Number
8.I.
Entity Name
Masteller & Moler
Subject
Amendment No. 2 to agreement for professional services;
45th Street Roadway Improvements
Project Number
IRC-1722
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MJ MASTELLER & MOL <br />M1 — CIVIL ENGINEERS <br />INC. <br />165527 1h <br />Ste. 2, Vero Beach, FL 32960 <br />(772) 567-5300 <br />streets where the new water main will be designed to be connected to existing water mains to <br />the north of the 45th Street right-of-way. <br />In addition, there are two (2) locations where 8" water mains serve sites to the south of 45th <br />Street which will also need to be reconnected to the new main. One is at the former truss <br />company site. The second is soon to be constructed at the 45th Street Industrial Park site <br />(designed by MVB) and currently under development. We will need to design improvements to <br />allow for connecting the proposed new water main to the proposed new water main as well as <br />to assure the water service to their lift station is reconnected as well. <br />It is expected the design will need to incorporate line stops on portions of the existing water <br />mains to remain in place to facilitate allowing connections of new mains to existing mains. <br />The new water main will be designed both horizontally and vertically to avoid the proposed <br />stormwater drainage facilities planned to be constructed with the 45th Street Roadway <br />Improvements project. Existing water services will be designed to be moved from the existing <br />main to the new main. Water main adjustments for the new main will be depicted with fittings with <br />the option to allow the Contractor to deepen the main where required without the use of fittings. <br />It is understood the replacement of the water main along 45th Street will not require the issuance <br />of a Florida Department of Environmental Protection (FDEP) permit. <br />Task L— Permitting: The design of the water main improvements will be submitted to both Indian <br />River County Utilities and Public Works Department to support issuance of a Right-of-way Utility <br />permit for the project. <br />Fee Schedule: The COUNTY agrees to pay, and the CONSULTANT agrees to accept a lump sum amount <br />for the above-described services as listed below: <br />Task K: Surveying <br />$ 3,000.00 <br />Task L: Design <br />$ 26,900.00 <br />Task M: Permitting <br />$ 6,000.00 <br />Total Lump Sum <br />$ 35,900.00 <br />Time Schedule: Amendment No. 2 shall be completed as follows: <br />A. Task K: Surveying 20 Working Days <br />B. Task L: Design 30 Working Days <br />C. Task M: Permitting 30 Working Days <br />Deliverables—the CONSULTANT shall provide to IRCUD: <br />a. Construction Plans (Preliminary) 11" x 17" & 24" x 36" 2 sets <br />b. Construction Plans (Final) 11" x 17" & 24" x 36" 2 sets & 1 Digital <br />File#1804 <br />(Y:\mm\Projects\2018\1804 - 45th ST\ADMIN\Contracts\Amend 2 - New WM\AmendmentNo2_19-1213.docx) <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.