My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/22/2019 (3)
CBCC
>
Meetings
>
2010's
>
2019
>
10/22/2019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 10:19:01 AM
Creation date
2/12/2020 10:18:43 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/22/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Material Schedule Subtotal: $35,409.57 <br /> Labor Schedule <br /> [Categories Hours Hourly Rate Extended Sell <br /> Project Management 40.0 $121.43 $4,857.14 <br /> I.T. 40.0 $128.57 $5,142.86 <br /> Pre-Fabrication 32.0 $60.00 $1,920.00 <br /> Engineering 8.0 $100.00 $800.00 <br /> CAD 24.0 $78.57 $1,885.71 <br /> Labor Schedule Subtotal: $14,605.71 <br /> Subcontracting &Cable Schedule <br /> [Categories Qty Unit Price <br /> install Labor $25,333.33 <br /> Additional Cables and Locks: <br /> (91-200182-0062)-Diebold-CAT 6, 23 GAUGE SOLID BARE 3500 FT $1,400.00 <br /> COPPER,4 TWISTED PAIR, <br /> Subcontracting &Cable Schedule Subtotal: $26,733.33 <br /> SECUKITAS <br /> Electronic Security <br />
The URL can be used to link to this page
Your browser does not support the video tag.