My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/22/2019 (3)
CBCC
>
Meetings
>
2010's
>
2019
>
10/22/2019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 10:19:01 AM
Creation date
2/12/2020 10:18:43 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/22/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSENT <br /> INDIAN RIVER COUNTY, FLORIDA <br /> MEMORANDUM <br /> TO: Jason E. Brown, County Administrator <br /> THROUGH: Richard B. Szpyrka, P.E., Public Works Director <br /> FROM: James W. Ennis, P.E., PMP, Assistant Public Works Director <br /> SUBJECT: FDOT Local Agency Program (LAP) Agreement and Resolution Authorizing <br /> the Chairman's Signature for 43rd Avenue Sidewalk Improvements from <br /> Airport Drive West to 41St Street (IRC-1503) <br /> FM No. 440019-1-58-01 <br /> DATE: October 10, 2019 <br /> DESCRIPTION AND CONDITIONS <br /> Indian River County has been awarded a$432,783.00 Florida Department of Transportation(FDOT) <br /> Local Agency Program (LAP)Grant for the construction of an 8-foot wide concrete sidewalk along <br /> the east side of 43rd Avenue from Airport Drive West to 41st Street. The sidewalk improvements <br /> will be approximately 0.85 miles in length.The work will also include erosion control,maintenance <br /> of traffic, ditch grading, minor drainage piping with drainage structures, signing and pavement <br /> markings. This project is scheduled to be advertised January 2020 must be completed by <br /> December 31, 2021. <br /> The FDOT has requested Indian River County execute and deliver to the FDOT the attached <br /> Agreement as well as a Resolution authorizing the Board of County Commissioners to execute this <br /> Local Agency Program Agreement. <br /> FUNDING <br /> The federal funds appropriated for this FDOT LAP grant are in the amount of$432,783.00. The <br /> Engineering Division estimates the total cost for the construction to be approximately$487,176.00. <br /> Funding is budgeted and available from Secondary Roads Account No. 10921441-066510-18026, <br /> 43rd Avenue Sidewalk (Airport Drive — 41st Street). Funds in the amount of $54,393.00 will be <br /> required above the maximum amount provided by the FDOT LAP grant to fund the difference. <br /> 78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.