My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/03/2019
CBCC
>
Meetings
>
2010's
>
2019
>
12/03/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 12:00:12 PM
Creation date
2/13/2020 11:05:20 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/03/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
441
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LARRY SCHLITT CONSTRUCTION, INC. <br />1000 291h Avenue <br />Vero Beach, FL 32960 <br />License #CBC059392 <br />Cell (772)473-2088;0 Office (772)473-2066 <br />Email: Ischlittconst@belIsouth.net <br />PROPOSAL <br />Date <br />Job <br />11/12/2019 <br />west Regional <br />8405 8th Street <br />Wastewater Treatment <br />Vero Beach, FL 32968 <br />Facility <br />To: <br />Job Location: <br />Indian River County Dept. of Utilities <br />West Regional Wastewater Treatment Facility <br />180127th Street <br />8405 8th Street <br />Vero Beach, FL 32960 <br />Vero Beach, FL 32968 <br />Description <br />Estimate for work at the West Regional Wastewater Treatment Facility in IRC, 8405 8th Street, which <br />includes: <br />• Remove existing metal structure <br />• Remove two (2) blowers <br />• Keep one (1) blower operational during demo <br />• Pour new pad for the new blower <br />• Set new rack and install new control panels <br />• Set one (1) new blower and hookup <br />• Remove last blower and pour new pad <br />• Install 2nd new blower and hook up <br />• Install one (1) new pole light <br />• Install step down transformer and new 120/240 volt panel <br />• Reconnect 120 volt circuits <br />• Step down transformer and outdoor panel <br />Subtotal: $35,100.00 <br />Contractor's Fee: $3,000.00 <br />Total Cost: 38 100.00 <br />All material is guaranteed to be as specified, and the above work to be performed in accordance with he <br />drawings .and specifications submitted for above work and completed in a substantial workmanlike <br />manner for the sum of <br />$38,100.00 (Thirty -Eight Thousand One Hundred Dollars and no cents) <br />With payments to be made as follows: <br />Draw Schedule to be determined <br />99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.