My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/03/2019
CBCC
>
Meetings
>
2010's
>
2019
>
12/03/2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 12:00:12 PM
Creation date
2/13/2020 11:05:20 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/03/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
441
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Like existing demand, committed demand must be determined on a facility by facility basis. For <br />example, both existing demand and committed demand must be determined for each mai or roadway, <br />each school, each treatment plant, each major drainage conveyance, and the active cell in the landfill. <br />Also, like existing demand, committed demand estimates must be modified as projects are <br />completed; committed demand estimates must also be modified as new development orders are <br />approved and old development orders are terminated. <br />Protected Demand <br />The third type of demand is projected demand. This consists of two types. One is non- <br />committed/non-reserved, single-family lot demand for all subdivisions, while the other is new project <br />demand. <br />Non-committed/non-reserved single-family lot projected demand to the facility impacts associated <br />with construction on individual single-family lots in platted subdivisions and construction on legally <br />established individual single-family unplatted lots and acreage will constitute a de minimus impact on <br />public facilities and thus be exempt from concurrency review. Single-family home traffic impacts will <br />be accounted for through tracking single-family trips for use in development project traffic studies <br />and annual traffic count updates. <br />The second type of projected demand is new project demand. For each new project, demand <br />estimates must be made on a facility by facility basis. Only if sufficient available capacity exists for <br />each facility to be impacted can the project be approved and a development order issued. Upon <br />issuance of a development order, the estimated impacts on each facility would be considered as <br />committed demand. <br />Availability of Capacity <br />Facility capacity can be assessed two different ways. First, facility capacity can be determined by <br />facilities that are existing and available; examples would be existing treatment plants and existing <br />roadways with a set number of lanes. The second manner for assessing facility capacity is to consider <br />both existing, in -the -ground facilities as well as facility expansions or new facilities which are <br />programmed but not yet existing. <br />As part of the concurrency review process, the capacity of existing, in -the -ground facilities will be <br />considered in all cases. Programmed facilities will be considered in assessing capacity for each <br />public facility category when the following conditions are met: <br />➢ For sanitary sewer, potable water, solid waste and drainage facilities: <br />200 <br />
The URL can be used to link to this page
Your browser does not support the video tag.