My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-036
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 3:23:52 PM
Creation date
3/9/2020 12:08:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
03/03/2020
Control Number
2020-036
Agenda Item Number
8.I.
Entity Name
Lost Tree Preserve LLC
Subject
First Amendment to Agreement upsizing water main for Lost Tree Preserve PD
Area
4250 65th Street
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
follow the schedule outlined below: <br />1. Off-site water main to be paid once completion of all necessary testing, acceptance of <br />Florida Department of Environmental Protection (FDEP) Certification of Completion, <br />and acceptance of the water main dedication to Indian River County Department of <br />Utility Services (IRCDUS) per (IRCDUS) Water & Wastewater Utility Standards, March <br />2019 or latest edition. <br />2. Paragraph 1.D. shall be added to read as follows: <br />D. The County and Developer acknowledge that additions to the Agreement will be <br />necessary when future phases are contemplated. The 12" off-site water main and the <br />6" force main on 691h Street will be extended to the western limits of Lost Tree <br />Preserve PD when future phases of the project are constructed. The County and the <br />Developer agree that the Developer will pay 67% of the construction costs of the water <br />main that abuts Developer property (Lost Tree Preserve PD) with the County <br />responsible for the 33% balance. The 6" force main on 69th Street will be extended to <br />the western limits of Lost Tree Preserve PD. The County and the Developer agree that <br />the Developer will be pay 67% of the construction costs of the force main that abuts its <br />property with the County responsible for the 33% balance. The dollar value of these <br />future required improvements will be determined at the time the corresponding phase <br />of Lost Tree Preserve PD is proposed for construction. The payments and payment <br />schedule under this paragraph 1.D will be consistent with paragraph 1.A and 1.13 to the <br />Agreement, as amended. <br />3. Exhibit "D" attached to this Amendment shall be incorporated into Agreement as Exhibit "D". <br />4. All other provisions of the Agreement shall remain in full force and effect. <br />_ -Page 2 - <br />F:\UTI.ITIES\UTIATY - ENGINEERING\PROJECTS - UTILITY CONSTRUCTION PERMITS\65TH ST OFTSITE WATER MAIN (HIGH POINTE SURD) - UCP N 34800EVELOPERS AGREEMENT AW..NDMENT 2-13- <br />2020DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.