My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-038
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 3:25:06 PM
Creation date
3/9/2020 12:42:42 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Grant
Approved Date
03/03/2020
Control Number
2020-038
Agenda Item Number
8.K.
Entity Name
Federal Emergency Management Agency (FEMA)
Subject
Subaward and Grant Agreement Z1630 for Hurricane Dorian damages
Project Number
Z1630
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />J.R. SMITH, CLERK <br />FEMA <br />3. The total fixed -cost amount is established based on the aggregate of: <br />a. The estimated cost to restore disaster damaged facilities to pre -disaster design (size <br />and capacity) and function in accordance with eligible codes and standards; and <br />b. The estimated cost for cost-effective hazard mitigation measures associated with the <br />actual restoration SOW to be implemented. <br />4. If the Applicant accepts the fixed -cost offer for a Large Project, it is considered a Pilot <br />Project and the Applicant will: <br />a. Not be required to rebuild the facilities back to what existed prior to the disaster. <br />b. Be allowed to share funds across all of its Pilot Projects. <br />c. Not be required to track costs to specific work items. <br />d. Not be required to track costs or work to specific Pilot Projects since funds can be <br />shared across all of its Pilot Projects. <br />e. Be allowed to retain and use excess funds to reduce risk and improve future disaster <br />operations (subject to timely closeout). <br />f. Be eligible for cost-effective hazard mitigation on replacement projects. <br />B. DEADLINES <br />Outcome: Increase speed of recovery through timely agreement on fixed -cost offers. <br />1. Applicants have no more than 18 months from the disaster declaration date to: <br />a. Determine the actual SOW and hazard mitigation measures to be implemented; and <br />b. Accept a fixed -cost offer for each project (also subject to 30 -day deadline from receipt, <br />see B.2). <br />2. Each time FEMA transmits a fixed -cost offer, the Recipient and Applicant will have a <br />combined total of 30 calendar days from the date of FEMA's transmittal of the fixed -cost <br />offer to accept the offer (not to exceed the 18 -month deadline). Any projects without <br />accepted fixed -cost offers by the 30 -day and 18 -month deadlines will be processed using <br />standard PA policies and procedures and funded in accordance with Title 44 Code of <br />Federal Regulations §206.205. <br />3. Time extensions to accept fixed -cost offers must be approved by FEMA's Assistant <br />Administrator for Recovery. <br />C. HAZARD MITIGATION <br />Outcome: Promote resiliency through inclusion of hazard mitigation. <br />1. When the Applicant is restoring a facility to pre -disaster function, size, capacity, and <br />location, FEMA evaluates the proposed hazard mitigation SOW and cost-effectiveness <br />based on the criteria in Chapter 2.VII.0 of the PAPPG. <br />2. When the Applicant is restoring the function, but changing the pre -disaster capacity of a <br />facility (Improved Project), the proposed hazard mitigation SOW is developed based onthe <br />actual SOW to be implemented; however, the cost-effectiveness is evaluated based on the <br />fixed -cost amount accepted for the pre -disaster restoration SOW. If the capacity is <br />Page 2 of 8 FEMA Recovery Policy FP 104-009-7 <br />40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.