Laserfiche WebLink
Indian River Landfill LFG Control Systems Preventative Maintenance Schedules <br />Updated for Device: LFG Specialties Candlestick Flare Unit #1865 <br />Semi -Annual (January/July) <br />Operator Name: <br />Components Date: Date: <br />Piping <br />Check All Flange Gaskets for Leaks <br />Check Rubber Expansion Joints for Wear <br />Remove and Clean Flow Straightener <br />Blowers <br />Remove and Clean Check Valves <br />Remove and Repack Grease <br />Flow Meters <br />Clean Total Flow Meter Probe <br />Clean GCS Flow Meter Probe <br />Propane Pilot System <br />Check Solenoid Manual Overide <br />Clean Pressure Regulator Vent <br />Check All Connections for Leaks <br />Clean Solenoid Valve per Specifications <br />Control Panel <br />Check Wire Connections for Ccrrision <br />Check Wire Connections for tightness <br />Annual (January) <br />Operator Name: <br />Components Date: <br />Knock Out Pot <br />Inspect Internal Coating, Cover Gasket and Clean Demister Pad <br />Retighten Cover Bolts <br />LFG Blower <br />Inspect Foundation and Correct Deficiencies <br />Check Condition of Isolation Pads <br />Check Blower Motor Alignment <br />Check Wire Connection for Corrosion & Tigtness <br />Flame Arrester <br />Check Differential Pressure <br />Clean Element (As Needed) <br />Piping <br />Retighten All Flange Bolt Connections <br />Inspect Piping for Chipped Paint and Rust <br />Check Piping Alignment <br />Flow Meter <br />Calibrate Flow Meter <br />Flare Control Panel <br />Clean and Maintain Instruments per Specifications <br />Prove Out Alarm Shutdown Permissives <br />Indian River Landfill O&M Proposal Page 15 www.scsengineers.com <br />