My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-041A
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-041A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 3:26:12 PM
Creation date
3/11/2020 2:27:08 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
03/03/2020
Control Number
2020-041A
Agenda Item Number
15.B.2.
Entity Name
Republic Services of Florida and SWDD
Subject
SWDD 13th Amendment to contract agreement to include landfill gas system O&M services
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 3 - LIQUID LEVEL MONITORING AND REPORTING <br />SCS -FS will measure liquid levels in each of the vertical extraction wells every six -months. In wells <br />that contain pumps the liquid temperature will also be recorded. SCS -FS will submit the collected <br />data in the Republic formatted liquid level table in the monthly 0&M report that coincides with each <br />completed round of measurements. SCS -FS will also provide a list of wells that may require pumps <br />based on historical field measurement data. <br />TASK 4 - QUARTERLY AND SEMI-ANNUAL PUMP MAINTENANCE <br />Task 4A - SCS -FS will remove each of the pneumatic pumps located in condensate sumps and LFG <br />vertical extraction wells to check operation of the pumps and identify corroded or faulty components <br />that need to be replaced every six -months. SCS -FS will provide Republic with a summary of findings <br />along with a recommended parts list based on our findings. SCS -FS will make efforts to coordinate <br />purchasing pumps or replacement parts in advance of each scheduled preventative maintenance <br />cycle so parts can be replaced during routine inspections. <br />Task 4B - SCS -FS recommends that the pumps located in the condensate sumps be serviced at a <br />quarterly frequency. Due to the corrosive nature of landfill gas condensate and the important <br />function of the condensate sumps to keep the collection system fully operation, removing the pumps <br />once each quarter will allow for components prone to failure due to corrosion to be identified and <br />replaced before the pump fails. <br />TASK 5 - FLARE STATION BLOWER LUBRICATION/CHECK VALVE <br />INSPECTION/FLOW STRAIGHTENER INSPECTION <br />In addition to the manufacturers recommended maintenance the following items will be performed <br />twice per year: <br />o Removal and repacking lubrication of bearings and housing following alternative <br />greasing plan; <br />o Blower Outlet check valve inspection and cleaning; <br />o Flow Straightener inspection. <br />TASK 6 - AIR COMPRESSOR PREVENTATIVE MAINTENANCE <br />Once per quarter SCS -FS and Air Compressor works will perform minor and major services on the <br />three air compressors and two air dryers located at the flare station based on manufacturer's <br />recommendations. Additional information on air compressor maintenance is referenced in Appendix <br />B. <br />Indian River Landfill O&M Proposal Page 4 www.scsengineers.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.