My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/07/2020
CBCC
>
Meetings
>
2020's
>
2020
>
01/07/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 12:35:47 PM
Creation date
3/13/2020 12:14:09 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/07/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
continuous 14 -day period to include data collection in the 3 off site UFA monitor wells <br />with rental data loggers. Electronic water level data loggers installed in the six (6) UFA <br />monitor wells will be programmed to collect water level data during testing. Manual <br />water level measurements will be collected daily during background, pumping and <br />recovery phases of the APT to verify continuous electronic water level measurement <br />data. <br />Following the recovery period, water level data from the 6 monitoring wells will be <br />downloaded and evaluated to determine site specific aquifer hydraulic parameters for <br />comparison to aquifer parameters used in the current IRCU consumptive use permit. <br />Consultant will generate a brief technical memorandum to be submitted electronically <br />summarizing the testing procedure, water level data, comparison of UFA APT data to <br />results submitted in the Draft CDM Smith "Groundwater Modeling in Support of Indian <br />River County Utilities Consumptive Use Permit Modification" Report, 2016, and <br />recommendations. <br />TIME SCHEDULE <br />Services for Tasks 1 is anticipated to be completed within 4 - 6 weeks of notice to <br />proceed. Task 2 is anticipated to include up to 3-4 months of monitoring, including up to <br />3 — 4 weeks of technical memorandum preparation. <br />FEE SCHEDULE <br />We will provide these services in accordance with our Continuing Consulting <br />Engineering Services Agreement for Professional Services dated April 17th, 2018, by and <br />between INDIAN RIVER COUNTY, a political subdivision of the State of Florida <br />("COUNTY") and Kimley-Horn and Associates, Inc., ("Consultant"). <br />The Consultant will provide professional services for a lump sum fee as follows: <br />Task <br />No. <br />Task <br />Task Fee <br />Task 1 <br />Floridan Aquifer Monitor Well Data Logger <br />$20,329 <br />Task 2 <br />North Water Treatment Plant Aquifer Performance <br />Testing <br />$19,518 <br />TOTAL LUMP SUM FEE <br />$ 39,847 <br />ADDITIONAL SERVICES <br />The following services are not included in the Scope of Services for this project, but may <br />be required depending on circumstances that may arise during the execution of this <br />project. Additional services include, but may not be limited to the following: <br />• This work does not include groundwater modelling services <br />115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.