My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/07/2020
CBCC
>
Meetings
>
2020's
>
2020
>
01/07/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 12:35:47 PM
Creation date
3/13/2020 12:14:09 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/07/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Composting Areas <br />• Structures S8, S9, 511, and S12 <br />Task 1— Structural Design Services <br />The structural services are limited to the following list of components: <br />• Concrete elements of the above listed structures <br />• Aluminum grating support structures at the applicable above listed structures <br />• Aluminum handrail design at the applicable above listed structures <br />The structural drawings for the above listed structure will be a component set of the overall <br />project plan set and will consist of the following elements: <br />• Additional general notes and material specifications <br />• Structural Plan Views <br />• Structural sections <br />• Structural details, including typical joints <br />• Handrail details <br />• Grating support details <br />Design shall be performed in accordance with current Florida Building Code criteria, <br />supplemented by ACI. <br />Deliverable will consist of structural plan sheets, inclusive of specifications as notes on the <br />plans, to be incorporated into the overall set of construction plans being prepared by the <br />COUNTY. <br />This scope assumes there will be only two submittals to the COUNTY: at the 90% stage and at <br />the 100% stage. <br />Task 2 — Coordination and Meetings <br />The consultant will coordinate with up to one slide gate and aluminum stop log manufacturers. <br />The consultant will attend up to two meetings with the COUNTY. The first meeting (kickoff <br />meeting) shall occur upon NTP to verify layout and design criteria for the above listed <br />structures. The second meeting will take place upon receipt of 90% submittal comments. <br />72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.