Laserfiche WebLink
EXHIBIT C — TIME SCHEDULE <br />Upon authorization to proceed by the COUNTY, final design documents are expected <br />to take approximately eight (8) weeks from the Notice to Proceed (NTP). <br />NTP contingent upon BOCC approval <br />Interim Submittal (90% Design Drawings) 6 weeks following NTP <br />Final Submittal (100% Design Drawings) 2 weeks following 90% comments <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />75 <br />