My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-044
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 3:26:48 PM
Creation date
3/17/2020 12:50:17 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/10/2020
Control Number
2020-044
Agenda Item Number
8.L.
Entity Name
MBV Engineering, Inc.
Subject
Amendment #2 to Work Order #5
Phase 1 Construction Oversight and Certification Services
Area
Conservation/Public Access for Jones' Pier
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A - SCOPE OF WORK <br />It is our understanding that the COUNTY intends to construct an approximately 1,040 SF open pavilion <br />with bathrooms and associated parking at the Jones Pier Historic parcel located at 7770 Jungle Trail, <br />Vero Beach, FL. <br />The proposed improvements will require construction inspection and certification services during and <br />through final completion of the work. MBV Engineering, Inc. and Donadio & Associates. will provide <br />the necessary project oversight and certifications necessary, as outlined below in detail. <br />CONSTRUCTION PHASE <br />The Consultant will provide the following scope of services during the construction phase: <br />Civil <br />• Attendance to two (2) pre -construction meetings, as requested <br />• Shop Drawing review of Civil site components <br />• One (1) inspection during subbase construction <br />• One (1) inspection for sidewalk formboards <br />• One (1) inspection for asphalt milling construction <br />• One (1) inspection for water line testing <br />• Up to three (3) site visits during on-site sewer pipe and STEP system construction and testing <br />• One (1) inspection during drainage pipes and structure construction <br />• One (1) final inspection of civil site components in Phase 1 <br />• Review of testing reports and asbuilts provided by others <br />• Coordination with Site Contractor during construction <br />• Certification by EOR to County, SJRWMD and FDEP <br />NOTE: Above inspections are based on a duration of 2.5 hours each. <br />Architectural <br />• Six (6) additional site visits during the 3 -month construction period for observations, meetings <br />and pay draw reviews <br />DELIVERABLES <br />The Consultant shall provide the COUNTY with the following: <br />• Punchlist of deficient items upon final inspection <br />• Original letter of certification by Engineer of Record for Phase 1. <br />• Certifications forms for SJRWMD <br />• Certification forms for FDEP <br />
The URL can be used to link to this page
Your browser does not support the video tag.