My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/19/2019 (2)
CBCC
>
Meetings
>
2010's
>
2019
>
11/19/2019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2020 10:25:07 AM
Creation date
3/20/2020 10:21:37 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/19/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
321
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Communicate in writing to the COMMISSION when repairs or maintenance to be <br />conducted by the COMMISSION in accordance with paragraph A.2 hereof are deemed <br />necessary by the COOPERATOR. <br />9. Shall not, for any reason, convert all or any portion of the PROJECT SITES or <br />PROJECT FACILITIES to other purposes, without prior approval of the <br />COMMISSION. Any such conversion will result in termination of this Agreement. <br />10. Agrees that no launch fee shall be charged by the COOPERATOR. Entrance fees may <br />be collected by the COOPERATOR if existing at the time of the execution of this <br />Agreement or agreed to in writing by the COMMISSION, and if done in accordance <br />with all State and Federal laws and regulations. Entrance fees charged for the <br />PROJECT SITES by the COOPERATOR shall be imposed uniformly upon all users <br />without regard to age, sex, race, religion, handicap, or other lawfully prohibited <br />condition. All entrance fees charged by the COOPERATOR for the PROJECT SITES <br />must be uniform and consistent with fees charged throughout the COOPERATOR's <br />jurisdiction, and must be invested back into the maintenance of PROJECT SITES or <br />PROJECT FACILITIES, as identified in Attachment A. <br />11. Agrees not to restrict access hours between dawn to dusk to boat launching facilities <br />comprising the PROJECTS unless such restriction is agreed to by the COMMISSION in <br />writing and made part of this Agreement by way of an amendment. <br />12. Agrees, upon request, to provide the COMMISSION with any existing documents such <br />as surveys; design plans, or as built drawings as may be necessary for construction or <br />repair of the project facilities and to otherwise assist the COMMISSION, as <br />appropriate, in obtaining all necessary permits for work on the PROJECTS. As <br />available, the COOPERATOR further agrees to provide engineering services, when <br />necessary, to address special design problems or major rebuilds and for the purpose of <br />reviewing and signing permit applications requiring a professional engineer's signature. <br />In the event that special design problems or major rebuilds are identified, the <br />COOPERATOR may qualify for grant funding:through the COMMISSION'S programs <br />to cover the costs of these engineering services. If the COOPERATOR does not agree <br />to provide these engineering services, the specific PROJECT shall be removed from this <br />Agreement going forward. <br />13. Agrees to indemnify the Commission for any penalties imposed by United States, <br />Department of Interior due to the COOPERATOR'S non-compliance with applicable <br />Federal regulations, to the extent provide by law. Any such penalties will be paid by <br />the COOPERATOR. <br />14. Agrees to give the COMMISSION access to the PROJECT FACILITIES, through its <br />agents and employees for the purpose of inspecting the PROJECT FACILITIES <br />thereon, and to perform any duties imposed hereunder. The parties agree that, in <br />compliance with 50 CFR 80.132, those lands or waters on which capital improvements <br />67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.