Laserfiche WebLink
Satisfactory completion in accordance with the approved project and Florida East <br />Coast Railway, LLC permit shall be determined by the County Utilities Director and shall be <br />indicated by specific written approval of the County Utilities Director or his designated <br />representative, after receipt of a signed and sealed Certificate of Completion from the project <br />engineer of record. <br />5. At least 72 hours prior to the Developer, or Developer's contractors or <br />Developer's subcontractors entering upon the Florida East Coast Railway, LLC property, the <br />Developer shall schedule with Florida East Coast Railway, LLC a FEC flagman/watchman. <br />Developer shall also locate Florida East Coast Railway, LLC's, signal and train control cables by <br />calling the Florida East Coast Railway, LLC Engineering and Signal Department at (800) 342- <br />1131 ext. 2377. In addition, and also prior to any entry onto Florida East Coast Railway, LLC <br />property by Developer, Developer's contractors or Developer's subcontractors, a Certificate of <br />Insurance naming FDG Flagler Station ll, LLC and Florida East Coast Railway, LLC as an <br />additional insured must be submitted by the Developer to the Director — Corridor Management <br />and Marketing for Florida East Coast Railway, LLC. Developer, Developer's contractors or <br />Developer's subcontractors shall not begin construction, installation or any other work <br />associated with the Improvements on Florida East Coast Railway, LLC property until the <br />Developer presents satisfactory proof of meeting these requirements to the County. <br />6. All persons entering upon the Florida East Coast Railway, LLC property <br />must take a Roadway Worker Training Course with Railroad Protective Services, Inc. and be <br />certified yearly with a Roadway card through the on line training course at their website: <br />www.RRTrainers.com. Developer, Developer's contractors or Developer's subcontractors shall <br />not enter upon the Florida East Coast Railway, LLC property until the Developer presents <br />satisfactory proof of meeting these requirements to the County. <br />7. Prior to any digging or subgrade work on Florida East Coast Railway, <br />LLC, property, Developer, Developer's contractors or Developer's subcontractors shall call <br />"SUNSHINE" at 1-800-432-4770. <br />8. Subgrade crossing installation shall be marked by the erection of a <br />suitable monument located on each side of the Florida East Coast Railway, LLC's property. <br />9. All crossing work shall be of the usual strength and fitness for the <br />purpose intended to be done in good and workman -like manner by the Developer, Developer's <br />contractors or Developer's subcontractors, at its sole cost and expense and in a manner <br />satisfactory to the Florida East Coast Railway, LLC. Within 30 days after completion of <br />construction or installation, Developer shall certify to the Florida East Coast Railway, LLC in writing <br />that the fixture has been installed in substantial conformance with the plans attached as Exhibit <br />"B". Developer shall submit such certification to the County Utilities Director at the same time as <br />submitted to Florida East Coast Railway, LLC. <br />10. Developer shall pay all costs of supervision, labor and material incurred <br />by the Florida East Coast Railway, LLC in supervising, protecting and restoring the Florida East <br />Coast Railway, LLC property related to the Improvements. <br />11. If the Improvements consist of a pipe or conduit to extend under the <br />tracks of the Florida East Coast Railway, LLC, the same shall be located not less than 5.5 feet <br />4 <br />