SECTION 00550 - Notice to Proceed <br />TO: <br />A9-0 <br />ADDRESS: <br />Dated <br />Contract For: 43rd AVENUE SIDEWALK FROM AIRPORT DRIVE WEST TO 41St STREET <br />Project No: IRC -1503 <br />FM Number: 440019-1-58-01 <br />IRC Bid No. 2020016 <br />You are notified that the Contract Times under the above contract will commence to run on <br />By that date, you are to start performing your obligations under the Contract <br />Documents. The contract has allocated 150 calendar days for Substantial Completion of this <br />project and 180 calendar days for Final Completion. In accordance with Article 4 of the <br />Agreement the date of Substantial Completion is and the date of readiness for final <br />payment is <br />CONTRACTOR shall not commence work under this Contract until he has obtained all <br />insurance required under Article 5 and such insurance has been delivered to the OWNER and <br />approved by the OWNER, nor shall the CONTRACTOR allow any Subcontractor to commence <br />work on his subcontract until all similar insurance required of the Subcontractor has been so <br />obtained and approved. All such insurance shall remain in effect until final payment and at all <br />times thereafter when CONTRACTOR may be correcting, removing or replacing defective Work <br />in accordance with Article 13. <br />Also, before you may start any Work at the Site, you must: <br />(add other requirements, if applicable) <br />By: <br />INDIAN RIVER COUNTY <br />(OWNER) <br />(AUTHORIZED SIGNATURE) <br />(TITLE) <br />00550 - Notice to Proceed REV 1-4-11 <br />00550-1 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1503-43rd Ave Swk_Airport Dr to 41st St\1-Admin\Bids\13id Documents\Master Contract Documents\00550 -Notice to <br />Proceed REV 1-4-11.doc Rev. 05/01 <br />