My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-042B
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-042B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 10:56:41 AM
Creation date
4/21/2020 2:52:38 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/10/2020
Control Number
2020-042B
Agenda Item Number
8.G.
Entity Name
Florida Department of Transportation
FDOT
Subject
43rd Avenue Sidewalk from Airport Drive West to 41st Street
Contract Documents and Specifications
Project Number
IRC-1503
Bid Number
2020016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC CONSTRUCTION BOND <br />Bond No. 107172342 <br />(enter bond number) <br />BY THIS BOND, We PRP Construction Group, LLC , as Principal and <br />Travelers Casualty and Surety Company of America a corporation, as Surety, are bound to <br />Indian River County herein called Owner, in the sum of $ 474.826.80 <br />(Four Hundred Seventy -Four Thousand Eight Hundred Twenty -Six and 80/100 Dollars) <br />for payment of which we bind ourselves, our heirs, personal representatives, successors, <br />and assigns, jointly and severally. <br />THE CONDITION OF THIS BOND is that 4f Principal: <br />1. Performs the contract dated March 10th, 2020 , between Principal and Owner for <br />construction of 43rd Avenue Sidewalk from Airport Drive West to 41 st Street the contract being <br />made a part of this bond by reference, at the times and in the manner prescribed in the <br />contract; and <br />2. Promptly makes payments to all claimants, as defined in Section 255.05(1), Florida <br />Statutes, supplying Principal with labor, materials, or supplies, used directly or indirectly <br />by Principal in the prosecution of the work provided for in the contract; and <br />3. Pays Owner all losses, damages, expenses, costs, and attorney's fees, including <br />appellate proceedings, that Owner sustains because of a default by Principal under the <br />contract; and <br />4. Performs the guarantee of all work and materials furnished under the contract for the <br />time specified in the contract, then this bond is void; otherwise it remains in full force. <br />Any action instituted by a claimant under this bond for payment must be in accordance <br />with the notice and time limitation provisions in Section 255.05(2), Florida Statutes. <br />Any changes in or under the contract documents and compliance or noncompliance <br />with any formalities connected with the contract or the changes does not affect Surety's <br />obligation under this bond. <br />DATED ON March 10th, 2020 PRP Construction Group, LLC <br />14� jw <br />(Name of Principal) <br />A <br />M <br />L: Bracamonte,-(As-A <br />ida Licensed Resident <br />ravelers Casualtv and Suretv Cot:nban� <br />890M0yy0C <br />oq� N0 <br />v. _ <br />Fac )oo.0 <br />`K <br />(Name of Surety) �k4*,�Y; <br />er <br />Inquiries: (32.1)' 800-6594 <br />00610-3 <br />,r <br />00610 - Public Construction Bond <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1503-43rd Ave Swk_Airport Dr to 41st St\1-Admin\Bids\Bid <br />Documents\Master Contract Documents\00610 - Public Construction Bond.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.