My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-042B
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-042B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 10:56:41 AM
Creation date
4/21/2020 2:52:38 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/10/2020
Control Number
2020-042B
Agenda Item Number
8.G.
Entity Name
Florida Department of Transportation
FDOT
Subject
43rd Avenue Sidewalk from Airport Drive West to 41st Street
Contract Documents and Specifications
Project Number
IRC-1503
Bid Number
2020016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br />Title <br />Page <br />ARTICLE 1 - DEFINITIONS AND TERMINOLOGY.................................................................................................... 5 <br />1.01 Defined Terms.....................................:............................................................................................5 <br />1.02 Terminology......................................................................................................................................7 <br />ARTICLE 2 - PRELIMINARY MATTERS.....................................................................................................................8 <br />2.01 Delivery of Bonds............................................................................................................................. 8 <br />2.02 Copies of Documents....................................................................................................................... 8 <br />2.03 Commencement of Contract Times; Notice to Proceed................................................................. 8 <br />2.04 Starting the Work.............................................................................................................................. 8 <br />2.05 Before Starting Construction............................................................................................................8 <br />2.06 Preconstruction Conference............................................................................................................ 9 <br />2.07 Initial Acceptance of Schedules....................................................................................................... 9 <br />ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE...............................................................9 <br />3.01 Intent................................................................................................................................................. 9 <br />3.02 Reference Standards.......................................................................................................................10 <br />3.03 Reporting and Resolving Discrepancies.........................................................................................10 <br />3.04 Amending and Supplementing Contract Documents......................................................................10 <br />3.05 Reuse of Documents........................................................................................................................10 <br />ARTICLE 4 = AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; <br />REFERENCEPOINTS.............................................................................................................................11 <br />4.01 Availability of Lands..........................................................................................................................11 <br />4.02 Subsurface and Physical Conditions...............................................................................................11 <br />4.03 Differing Subsurface or Physical Conditions...................................................................................11 <br />4.04 Underground Facilities.....................................................................................................................12 <br />4.05 Reference Points.............................................................................................................................. 13 <br />4.06 Hazardous Environmental Condition at Site...................................................................................13 <br />ARTICLE5 - BONDS AND INSURANCE....................................................................................................................14 <br />5.01 Performance, Payment, and Other Bonds......................................................................................14 <br />5.02 Licensed Sureties and Insurers.......................................................................................................15 <br />5.03 Certificates of Insurance..................................................................................................................15 <br />5.04 CONTRACTOR's Liability Insurance...............................................................................................15 <br />5.05 OWNER's Liability Insurance...........................................................................................................16 <br />5.06 Property Insurance...........................................................................................................................16 <br />5.07 Waiver of Rights...............................................................................................................................17 <br />5.08 Receipt and Application of Insurance Proceeds.............................................................................18 <br />5.09 Acceptance of Bonds and Insurance; Option to Replace............................................................... 18 <br />5.10 Partial Utilization, Acknowledgment of Property Insurer.................................................................18 <br />ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES................................................................................................18 <br />6.01 Supervision and Superintendence...................................................................................................18 <br />6.02 Labor, • Working Hours......................................................................................................................19 <br />6.03 Services, Materials, and Equipment................................................................................................19 <br />6.04 Progress Schedule...........................................................................................................................19 <br />6.05 Substitutes and "Or-Equals".............................................................................................................19 <br />6.06 Concerning Subcontractors, Suppliers, and Others....................................................................... 21 <br />00700 - General Conditions REV 5-10-13 <br />00700-2 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1503-43rd Ave Swk_Airport Dr to 41st St\I-Admin\Bids\Bid Documents\IRC 1503 BID CONTRACT Add Date\00700 - General Conditions REV <br />5-10-13.doc - - - - <br />
The URL can be used to link to this page
Your browser does not support the video tag.