My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-042B
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-042B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 10:56:41 AM
Creation date
4/21/2020 2:52:38 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/10/2020
Control Number
2020-042B
Agenda Item Number
8.G.
Entity Name
Florida Department of Transportation
FDOT
Subject
43rd Avenue Sidewalk from Airport Drive West to 41st Street
Contract Documents and Specifications
Project Number
IRC-1503
Bid Number
2020016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br />PROTECTION OF THE WORK AND PROPERTY <br />B. Do not store or park materials or equipment within the drip line of trees that are <br />to remain. <br />C. Install temporary fences or barricades to protect trees and plants in areas subject <br />to traffic. <br />D. Fires shall not be permitted under or adjacent to trees and plants. <br />E. Within the limits of the Work, water trees and plants that are to remain, in order <br />to maintain their health during construction operations. <br />F. Cover all exposed roots with burlap and keep it continuously wet. Cover all <br />exposed roots with earth as soon as possible. Protect root systems from <br />mechanical damage and damage by erosion, flooding, run-off or noxious <br />materials in solution. <br />G. If branches or trunks are damaged, prune branches immediately and protect the <br />cut or damaged areas with emulsified asphalt compounded specifically for <br />horticultural use. <br />H. Remove all damaged trees and plants that die or suffer permanent injury and <br />replace them with a specimen of equal or better quality. <br />Coordinate Work in this Section with requirements of other sections herein. <br />1.4 PROTECTION OF IRRIGATION <br />The CONTRACTOR shall be responsible for maintaining in good condition all <br />irrigation systems within the easements, which could be damaged by <br />construction activities. The CONTRACTOR shall repair any irrigation systems <br />damaged by construction activities within two (2) days. Irrigation systems <br />partially within the right-of-way of 43rd Avenue and all intersecting side streets <br />within project limits may be cut off and capped or connected to same system to <br />maintain functionality. The CONTRACTOR shall be responsible for maintaining <br />the functionality of the remaining portion of the system if it should fall outside of <br />the right-of-way. <br />1.5 PROTECTION OF EXISTING STRUCTURES <br />A. Underground Structures: <br />1. Underground structures are defined to include, but not be limited to, all <br />sewer, water, gas, and other piping, and manholes, chambers, electrical <br />conduits, tunnels and other existing subsurface work located within or adja- <br />cent to the limits of the Work. <br />01541-2 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1503-43rd Ave Swk_Airport Dr to 41st St\1-Admin\Bids\Bid <br />Documents\IRC_1503_BID_CONTRACT_Add Date\01541 - Protection of Property.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.