My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-042B
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-042B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 10:56:41 AM
Creation date
4/21/2020 2:52:38 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/10/2020
Control Number
2020-042B
Agenda Item Number
8.G.
Entity Name
Florida Department of Transportation
FDOT
Subject
43rd Avenue Sidewalk from Airport Drive West to 41st Street
Contract Documents and Specifications
Project Number
IRC-1503
Bid Number
2020016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Or equivalent. <br />G. Construction Site Egress Driveways: Minimize the transport of sediment and soil <br />from the construction site or work area by vehicle wheels. Construct a crushed rock <br />driving surface at the vehicle exit point(s). Locate the site egress driveways a <br />minimum of 25 feet from all drainage inlets or pipes. Provide an area large enough <br />to remove the sediment and soil from vehicle wheels before the vehicle leaves the <br />construction site or work area. Provide wash -down stations as required to wash <br />Vehicle tires and retain all washwater on-site. Do not use limerock. <br />H. Rock and Stone for Erosion Control and Pollution Control and Treatment: <br />1. Crushed Limerock: Limerock shall not be used under any circumstance. <br />2. Acceptable Material: FDOT #4 non -calcareous aggregate, washed and <br />meeting the requirements of FDOT Standard Specifications for Road and <br />Bridge Construction, Section 901. <br />Hay Bales: Hay bales shall not be used. <br />PART 3 - EXECUTION <br />A. Design, construct, and maintain the pollution control and treatment system to <br />minimize erosion and capture and remove pollutants from the construction site and <br />from all other areas disturbed by construction activities. <br />B. Apply polyacrylamide in strict accordance with the polyacrylamide <br />manufacturer/supplier's recommendations and specifications. <br />C. REPAIR ALL EROSION DAMAGE — At no additional cost to the OWNER and <br />regardless of the state of completion of the Work, immediately clean all dirt and <br />debris from all pipes and drainage structures; and repair all flooding, washouts, and <br />all other erosion damage to the Work. This responsibility shall not end until Final <br />Acceptance of the Work by the OWNER. Included is damage caused by erosion of <br />any kind (e.g. wind, waves, stormwater runoff, hurricanes, etc.) including.Acts of <br />God. Restore all erosion damaged areas to design grades and elevations. Also, <br />refer to General Conditions 6.13.B. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 104-1 - Prevention, Control, and Abatement of Erosion and Water <br />Pollution - Per Lump Sum <br />[The remainder of this page was left blank intentionally] <br />01025-10 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1503-43rd Ave Swk_Airport Dr to 41st St\1-Admin\Bids\Bid <br />Documents\Master Contract Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.