removed and stored in the County's Storage Yard if they are deemed salvageable <br />by the Engineer. The excavated materials shall be removed from the job site and <br />disposed in a location designated or approved by the Owner. Any culverts, <br />structures or any material excavated or removed from the project site under clearing <br />and grubbing deemed unsalvageable by the Engineer shall be disposed of in a legal <br />manner by the Contractor. Where required, suitable material as approved by the <br />Engineer shall then be backfilled and compacted to restore the original contour of <br />the ground. The fill material shall be backfilled and compacted in accordance with <br />Section 120 of these specifications. <br />H. No additional payment will be made, nor will additional work, or change orders be <br />authorized forwork needed to remove, relocate, protect, or otherwise accountfor in <br />the construction of the work depicted in the plans, for any feature, or item that would <br />be apparent from a careful inspection of the site and review of the plans, even <br />though such feature or item is not specifically called out in the plans. It is therefore <br />essential the contractor make such inspection and review. <br />The unit price bid for this item shall include the cost of all labor, tools, and <br />equipment necessary to excavate, remove, and dispose of those items as directed <br />by the Engineer and where designated on the Drawings. The cost of restoration <br />and backfill and compaction for the specific area of removal shall also be included <br />under this item. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 110-1-1 - Clearing & Grubbing - Per Lump Sum <br />EARTHWORK AND RELATED OPERATIONS FOR LAP (OFF -SYSTEM) <br />(REV 1-23-12) (FA 2-27-12) <br />SECTION 120 <br />EARTHWORK AND RELATED OPERATIONS FOR LAP (OFF -SYSTEM) <br />120-1 Description. <br />120-1.1 General: Perform earthwork and related operations based on the type of <br />work specified in the Contract and the Earthwork Categories as defined below. Meet the <br />applicable requirements for materials, equipment and construction as specified. <br />Earthwork and related operations consists of excavation for the construction <br />of the roadway, excavation for structures and pipe, constructing backfill around structures <br />and pipe, and constructing embankments as required for the roadway, ditches, and channel <br />changes. <br />120-1.2 Earthwork Categories: Performance of Earthwork Operations will fall into <br />one of the following Earthwork Categories: <br />120-1.2.1 Earthwork Category 1: Includes the earthwork and related <br />operations associated with the construction of sidewalks and bike paths along with any <br />drainage structures associated with these facilities. <br />01025-15 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1503-43rd Ave Swk_Airport Dr to 41st St\1-Admin\Bids\Bid <br />Documents\Master Contract Documents\Technical Specifications.doc <br />