My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-042B
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-042B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 10:56:41 AM
Creation date
4/21/2020 2:52:38 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/10/2020
Control Number
2020-042B
Agenda Item Number
8.G.
Entity Name
Florida Department of Transportation
FDOT
Subject
43rd Avenue Sidewalk from Airport Drive West to 41st Street
Contract Documents and Specifications
Project Number
IRC-1503
Bid Number
2020016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
waterproof cover mounted in such a manner that it can cover the entire load when required. <br />When in place, overlap the waterproof cover on all sides so it can be tied down. Cover each load <br />during cool and cloudy weather and at any time it appears rain is likely during transit with a <br />tarpaulin or waterproof cover. Cover and tie down all loads of friction course mixtures. <br />334-5.5 Preparation of Surfaces Prior to Paving: <br />334-5.5.1 Cleaning: Clean the surface of all loose and deleterious material by the <br />use of power brooms or blowers, supplemented by hand brooming where necessary. <br />334-5.5.2 Patching and Leveling Courses: As shown in the plans, bring the <br />existing surface to proper grade and cross-section by the application of patching or leveling <br />courses. <br />334-5.5.3 Application over Surface Treatment: Where an asphalt mix is to be <br />placed over a surface treatment, sweep and dispose of all loose material from the paving area. <br />334-5.5.4. Tack Coat: Use a rate of application as defined in Table 334-5. Control <br />the rate of application to be within plus or minus 0.01 gallon per square yard of the target <br />application rate. The target application rate may be adjusted by the Engineer to meet specific <br />field conditions. Determine the rate of application as needed to control the operation. When <br />using PG 52-28, multiply the target rate of application by 0.6. <br />Table 334-5 <br />Tack Coat Application Rates <br />Asphalt Mixture Type <br />Underlying Pavement Surface <br />Target Tack Rate <br />al/ d2 <br />Base Course, Structural Course, <br />Dense Graded Friction Course <br />Newly Constructed Asphalt Layers <br />0.03 minimum <br />Milled Surface or Oxidized and <br />Cracked Pavement <br />0.06 <br />Concrete Pavement <br />0.08 <br />334-5.6 Placing Mixture: <br />334-5.6.1 Alignment of Edges: With the exception of pavements placed adjacent <br />to curb and gutter or other true edges, place all pavements by the stringline method to obtain an <br />accurate, uniform alignment of the pavement edge. Control the unsupported pavement edge to <br />ensure that it will not deviate more than plus or minus 1.5 inches from the stringline. <br />334-5.6.2 Rain and Surface Conditions: Immediately cease transportation of <br />asphalt mixtures from the plant when rain begins at the roadway. Do not place asphalt mixtures <br />while rain is falling, or when there is water on the surface to be covered. Once the rain has <br />stopped and water has been removed from the tacked surface to the satisfaction of the Engineer <br />and the temperature of the mixture caught in transit still meets the requirements as specified in <br />334-5.3, the Contractor may then place the mixture caught in transit. <br />334-5.6.3 Checking Depth of Layer: Check the depth of each layer at frequent <br />intervals to ensure a uniform spread rate that will meet the requirements of the Contract. <br />334-5.6.4 Hand Work: In limited areas where the use of the spreader is impossible or <br />impracticable, spread and finish the mixture by hand. <br />334-5.6.5 Spreading and Finishing: Upon arrival, dump the mixture in the <br />approved paver, and immediately spread and strike -off the mixture to the full width required, and <br />to such loose depth for each course that, when the work is completed, the required weight of <br />01025-32 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1503-43rd Ave Swk_Airport Dr to 41st St\1-Admin\Bids\Bid <br />Documents\Master Contract Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.