334-5.9.2 Longitudinal Joints: For all layers of pavement except the leveling <br />course, place each layer so that longitudinal construction joints are offset 6 to 12 inches laterally <br />between successive layers. Do not construct longitudinal joints in the wheel paths. The Engineer <br />may waive these requirements where offsetting is not feasible due to the sequence of <br />construction. <br />334-5.10 Surface Requirements: Construct a smooth pavement with good surface <br />texture and the proper cross slope. <br />334-5.10.1 Texture of the Finished Surface of Paving Layers: Produce a <br />finished surface of uniform texture and compaction with no pulled, torn, raveled, crushed or <br />loosened portions and free of segregation, bleeding, flushing, sand streaks, sand spots, or ripples. <br />Correct any area of the surface that does not meet the foregoing requirements in accordance with <br />334-5.10.4. <br />In areas not defined to be a density testing exception per 334-6.4.1, obtain for the <br />Engineer, three 6 inch diameter roadway cores at locations visually identified by the Engineer to <br />be segregated. The Engineer will determine the density of each core in accordance with FDOT <br />Test Method FM 1-T 166 and calculate the percent Gmm of the segregated area using the average <br />Gmb of the roadway cores and the representative PC Gmm for the questionable material. If the <br />average percent Gm,,, is less than 90.0, address the segregated area in accordance with 334-5.10.4. <br />334-5.10.2 Cross Slope: Construct a pavement surface with cross slopes in <br />compliance with the requirements of the Contract Documents. <br />334-5.10.3 Pavement Smoothness: Construct a smooth pavement meeting the <br />requirements of this Specification. Furnish a 15 foot manual and a 15 foot rolling straightedge <br />meeting the requirements of FDOT Test Method FM 5-509. <br />334-5.10.3.1 Straightedge Testing: <br />334-5.10.3.1.1 Acceptance Testing: Perform straightedge testing <br />in the outside wheel path of each lane for the final (top) layer of the pavement. Test all <br />pavement lanes where the width is constant using a rolling straightedge and document all <br />deficiencies on a form approved by the Engineer. Notify the Engineer of the location and time of <br />all straightedge testing a minimum of 48 hours before beginning testing. <br />334-5.10.3.1.2 Final (Top) Pavement Layer: At the completion <br />of all paving operations, straightedge the final (top) layer either behind the final roller of the <br />paving train or as a separate operation. Address all deficiencies in excess of 3/16 inch in <br />accordance with 334-5.10.4, unless waived by the Engineer. Retest all corrected areas. <br />334-5.10.3.1.3 Straightedge Exceptions: Straightedge testing will <br />not be required in the following areas: shoulders, intersections, tapers, crossovers, sidewalks, <br />shared use paths, parking lots and similar areas, or in the following areas when they are less than <br />250 feet in length: turn lanes, acceleration/deceleration lanes and side streets. The limits of the <br />intersection will be from stop bar to stop bar for both the mainline and side streets: In the event <br />the Engineer identifies a surface irregularity in the above areas that is determined to be <br />objectionable, straightedge and address all deficiencies in excess of 3/8 inch in accordance with <br />334-5.10.4. <br />334-5.10.4 Correcting Unacceptable Pavement: Correct deficiencies in the <br />pavement layer by removing and replacing the full depth of the layer, extending a minimum of <br />50 feet on both sides (where possible) of the defective area for the full width of the paving lane, <br />at no additional cost. <br />01025-34 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1503-43rd Ave Swk_Airport Dr to 41st St\1-Admin\Bids\Bid <br />Documents\Master Contract Documents\Technical Specifications.doc <br />