SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and PRP Construction Group, Inc. <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The work will consist of the construction of an 8 -foot -wide concrete sidewalk <br />along the east side of 43rd Avenue from Airport Drive West to 41s' Street. The sidewalk <br />improvements will be approximately 0.85 miles in length. The work will also include <br />erosion control, maintenance of traffic, ditch grading, minor drainage piping with drainage <br />structures, signing and pavement markings. This is an F.D. 0.T Local Agency Program <br />(LAP) funded project FM No. 440019-1-58-01. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: 43rd AVENUE SIDEWALK FROM AIRPORT DRIVE WEST TO <br />41 st STREET <br />County Project Number: IRC -1503 <br />FM Number: 440019-1-58-01 <br />Bid Number: 2020016 <br />Project Address: 43rd Avenue from Airport Drive West to 41St Street, Vero <br />Beach, Florida 32960 & 32967 <br />ARTICLE 3 — ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER and <br />will act as OWNER's representative, assume all duties and responsibilities, and have the <br />rights and authority assigned to ENGINEER in the Contract Documents in connection with <br />the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />00520 - Agreement (Public Works) FOR LAP PROJECTS ONLY.docx <br />00520-2 <br />H:\Bids\2019-2020 FY (2020000)\2020016 43rd Ave Sidewalks\00520 - Agreement (Public Works) FOR LAP PROJECTS ONLY.docx <br />