Laserfiche WebLink
IRC -1503, 43rd Avenue Sidewalk Questions asked prior to Pre -Bid meeting January 7, 2019 <br />1. Is there an estimate for the project? Does that include Force Account? <br />Engineers Estimate is $509,706.38 and yes, does include force account <br />2. Drawing scale is incorrect when printed at' 100%, can they be re -issued to scale? <br />No <br />3. Is the embankment quantity a compacted, in place quantity? <br />Yes <br />4. Please clarify the gravel driveway at Station 27+50 Section A -A shows gravel while Section B -B shows 6" coquina <br />rock. <br />Should be 6" coquina rock <br />5. Can 43rd Avenue be closed for the drainage crossing, if so duration limit? <br />Yes, nighttime only, hours of 7PM — 6AM, contractor to provide MOT plan for night work, needs FDOT approval, and <br />contractor will be responsible to provide all MOT for such work. Road needs to be open each day. <br />6. Concrete sidewalk detail on Sheet C-30 says to reinforce where required with No. 3 bars, where is that? <br />Refers to driveway on Sheet C-18. Engineer of Record, Aaron Stanton stated the rebar shall be placed in the sidewalk <br />across the 23' width of the driveway and extend 3' beyond both in the north and south direction. <br />7. Should Item 430-984625 be 15" MES, not 18"? <br />Yes, Pay Item should be 430-984623, which is MES for 15" equivalent, pipe to be 12" x 18", plan view says 15" RCP <br />8. Will flowable fill be required over the entire area of road construction because quantity would be off? <br />Follow detail on Sheet C-30, for this size pipe, 10' wide is for flowable fill, pavement restoration is minimum 14' <br />9. Since this is a LAP project will all bidders need to be Pre Qualified in order to bid? <br />No <br />At the Meeting: <br />1. What is the road classification of the road Segment? <br />Urban Minor Arterial <br />2. Does Section 496 need to be filled out if the contractor does not have any FOOT projects? <br />FDOT Form 525-010-46, "LAP CERTIFICATION OF CURRENT CAPACITY" (Section 00496) in Bid Documents) is <br />required to be completed and submitted with the LAP bids. The contractor is certifying that they <br />have the financial capacity to complete the project. If the contractor is not a FOOT pre -qualified <br />contractor, leave the "Fill inthe FDOT Vendor Number VF" section blank. Complete the rest of the form <br />(both Page land Page 2) and submit with bid. <br />F: Public Works/Engineering Division Projects/IRC-1503/1-Admin/Meetings/Bids/Questions <br />