My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/04/2020
CBCC
>
Meetings
>
2020's
>
2020
>
02/04/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 1:01:22 PM
Creation date
4/28/2020 12:46:46 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/04/2020
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A" <br />EXISTING I.R.C.D.U.S. LIFT STATION # 1179 <br />EXISTING LIFT STATION IMPROVEMENTS <br />1) REMOVE EXISTING PIPING AND ACCESSORIES FROM WET WELL. INSTALL 66" <br />DIAMETER FIBERGLASS LINER PER MANUFACTURERS SPECIFICATIONS. <br />2) REPLACE EXISTING PIPING IN LIFT STATION AND VALVE BOX WITH HDPE <br />PIPING. REPLACE EXISTING CHECK VALVES IN VALVE BOX. INSTALL ISOLATION <br />VALVE ON OUTSIDE OF VALVE BOX. <br />3) REPLACE WET WELL AND VALVE BOX CONCRETE LIDS AND ACCESS DOORS PER <br />I.R.C.D.U.S. SPECIFICATIONS. <br />4) INSTALL A STAINLESS STEEL ELECTRICAL DISCONNECT. <br />5) REPLACE EXISTING PUMPS IN WET WELL WITH THE PROPOSED (2) FLYGT <br />MODEL#NP3127.181 PUMPS. <br />6) RESET THE FLOAT ELEVATIONS WITH THE PROPOSED ELEVATIONS LISTED IN <br />THE PUMPING STATION DATA TABLE. <br />7) ALL WORK IS TO BE COMPLETED IN ACCORDANCE WITH THE INDIAN RIVER <br />COUNTY UTILITIES CONSTRUCTION SPECIFICATIONS AND DETAILS. <br />115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.