My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/04/2020
CBCC
>
Meetings
>
2020's
>
2020
>
02/04/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 1:01:22 PM
Creation date
4/28/2020 12:46:46 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/04/2020
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County, Florida <br />Department of Utility Services <br />Board Memorandum <br />Date: January 16, 2020 <br />To: Jason E. Brown, County Administrator <br />From: Vincent Burke, PE, Director of Utility Services <br />Prepared By: Arjuna Weragoda, PE, Capital Projects Manager <br />Subject: Roseland Road Force Main Extension and Wastewater Facilities for Dale Wimbrow and <br />Donald McDonald Parks <br />Background: <br />Indian River County Department of Utility Services (IRCDUS) proposes to extend the existing force main along <br />Roseland Road. The extension of the force main will facilitate the two (2) parks owned and operated by Indian <br />River County, City of Sebastian's Municipal Airport facility, City of Sebastian residents, and unincorporated <br />Indian River County residents to connect to centralized sewer at a future date. The extension of this force <br />main will serve as the main collector to all the properties between Sunset Drive to the north and Hotchkiss <br />Drive to the south. <br />Analysis: <br />Staff reached out to Masteller and Moler, Inc. (M&M), for a proposal to provide surveying, design, <br />geotechnical, permitting, bidding, and construction phase assistance. <br />The work order has been provided in accordance with the Continuing Contract Agreement for Professional <br />Engineering Services with M&M dated April 17, 2018. The scope is more specifically described in the attached <br />Work Order No. 8. The total negotiated cost for Work Order No. 8 is a total sum amount of $116,880.00. The <br />design cost will be split between IRCDUS and Parks and Recreation. <br />Funding <br />Funding in the amount of $62,380 is budgeted and available for the Utilities portion of this project. Capital <br />fund revenues are generated from impact fees. Furthermore, new growth has created the need for the <br />expansion or construction of the facilities, and that new growth will benefit from the expansion or <br />construction of the facilities. <br />Funding in the amount of $54,500 is budgeted and available in the Optional Sales Tax fund for the wastewater <br />facilities for Dale Wimbrow and Donald McDonald Parks. <br />58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.