My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/04/2020
CBCC
>
Meetings
>
2020's
>
2020
>
02/04/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 1:01:22 PM
Creation date
4/28/2020 12:46:46 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/04/2020
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Hugh Russell, 11— GP / Co -Trustee <br />December 20, 2019 <br />Page 2 of 8 <br />It is understood both property owners are willing to convey right-of-way for the Public Road to Indian <br />River County. In order to expedite the design and permitting of the project, it is understood the <br />Harbor Bluffs site will provide for the stormwater needs for the 11th Drive improvements on the <br />balance of its site via drainage easements which may be modified in the future to be consistent with <br />future development plans. <br />Therefore, Masteller & Moler, Inc. proposes herein to provide you with the necessary design plans, <br />engineering, and surveying services to complete the following scope of work associated with the 11th <br />Drive Roadway Improvements project: <br />SCOPE OF SERVICES <br />Task I — Land Surveying <br />A. We shall prepare Sketch & Legal Descriptions of the proposed right-of-way for 11th Drive to <br />be conveyed from both the "Russell" and "Riverfront" properties in accordance with the <br />Developer's Agreement approved by the Board of County Commissioners on October 22, <br />2019. <br />Our lump sum fee for Task IA is $ 750.00. <br />B. We shall prepare a Route / Topographic Survey of the Harbor Bluffs site as well as sufficient <br />offsite areas to support the design of the Public Road through the site. The limits of the <br />topographic survey will include portions of 41st Street fronting the site, portions of the <br />Riverfront Groves site, and the northern end of proposed 11th Drive at the south line of Harbor <br />Bluffs. The survey will depict existing rights -of -ways and all aboveground physical features <br />encountered along the route. Elevations shall be provided on NAVD'88 datum. <br />Our lump sum fee for Task IB is $ 9,875.00. <br />C. We shall prepare a Sketch & Legal Description of proposed stormwater management tracts <br />to be situated on the "Russell" Harbor Bluffs property outside of the proposed 11th Drive right- <br />of-way limits. <br />Our lump sum fee for Task IC is $ 600.00. <br />The specific scope of services to be performed for Task 1 will be completed by Masteller, Moler <br />& Taylor, Inc. (MMT) based on the attached proposal dated October 31, 2019. <br />Task II — Roadway Construction Plans <br />We shall develop Roadway Construction Plans for Harbor Bluffs portion of Public 11th Drive <br />Improvements from 41st Street to the south line of the Harbor Bluffs site in Indian River County, <br />Florida. We shall also develop plans for required turn lane improvements at access locations into <br />the Harbor Bluffs site both east and west of the 11th Drive alignment as required by the Conceptual <br />Site Plan approved Traffic Impact Analysis. <br />The Roadway Construction Plans shall include both Plan and Profiles views of the proposed <br />roadway as well as cross-sections at appropriate intervals. <br />87 ILA' <br />
The URL can be used to link to this page
Your browser does not support the video tag.