My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-088
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 10:35:50 AM
Creation date
5/12/2020 11:17:48 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/05/2020
Control Number
2020-088
Agenda Item Number
5.C.
Entity Name
Masteller & Moler, Inc.
Subject
North County Phase 2 Water & Sewer Project plans update & bidding services CCNA2018 Work Order No. 9
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FXHIRIT "A" <br />WORK ORDER NUMBER 9 <br />NORTH COUNTY SEWER & WATER SYSTEM — PHASE TWO <br />PLANS UPDATE, SPECIFICATIONS & BIDDING SERVICES <br />GENERAL INFORMATION <br />The Indian River County Utilities Department has decided to move forward with bidding and construction of <br />Phase Two of the North County Sewer System. A previous Work Order provided for Engineering Services in <br />connection with the design and preparation of construction plans and permitting applications for a gravity <br />sanitary sewer collection and conveyance system and potable water distribution system to serve residential <br />areas in the North County known as Study Area Number 2. Masteller & Moler, Inc. has completed the Design, <br />Contract Plans and Permitting Applications for the project. Phase 2 for this project is generally defined as <br />follows: <br />The residential area along Ruffner Drive from the cul-de-sac north to Bay Street; <br />the western portion of Ercildoune Heights along the Saint Sebastian River; and <br />the area of Roseland between Roseland Road and the Saint Sebastian River from Kelso Place to 128th <br />Court. <br />The County has been successful in securing grant funding for construction and the County wishes to construct <br />the project. This Work Order provides for Engineering Services necessary for the project's plan update, <br />contract specifications / bid documents, and bidding services. <br />A brief description of the scope of services and deliverables for this Work Order is provided as follows: <br />SCOPE OF SERVICES <br />Task A — Update Project Plans <br />Task A provides for professional engineering services to review and update the Construction Plans used for <br />project permitting and update the plans with final checklist so they are suitable for bidding. <br />Task B — Contract Specifications & Bid Documents <br />Task B provides for professional engineering services in order to prepare contract specifications and bid <br />documents to be used along with the construction plans to bid and construct the project. <br />Task C — Bidding Services <br />Task C provides engineering services during the project's bidding process generally including the following: <br />1. Preparation for and attendance at a mandatory pre-bid meeting and preparation of a letter of <br />response to include in an addendum. <br />2. Research and responses to bidders' questions to be incorporated into written addenda during the <br />bidding process. <br />3. Review submitted bids, evaluate for correctness and completion, contact references (if applicable), <br />and provide Letter of Findings and Recommendation of Contract Award. <br />Exhibit "A" - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.