Laserfiche WebLink
Site which have been identified in the Supplementary Conditions as provided in <br />paragraph 4.06 of the General Conditions. <br />E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for <br />having done so) all additional or supplementary examinations, investigations, <br />explorations, tests, studies, and data concerning conditions (surface, subsurface, and <br />Underground Facilities) at or contiguous to the Site which may affect cost, progress, or <br />performance of the Work or which relate to any aspect of the means, methods, <br />techniques, sequences, and procedures of construction to be employed by <br />CONTRACTOR, including applying the specific means, methods, techniques, <br />sequences, and procedures of construction, if any, expressly required by the Contract <br />Documents to be employed by CONTRACTOR, and safety/precautions and programs <br />incident thereto. / <br />F.. CONTRACTOR does not consider that any further 'examinations, investigations, <br />explorations, tests, studies, or data are necessary for the performance of the Work at <br />the Contract Price, within the Contract Times,\and in accordance with the other terms <br />and conditions of the Contract Documents. <br />G. CONTRACTOR is aware of the general�'i�tuir-e�\\o\f\workto be performed by OWNER <br />and others at the Site that relates to`the\Work as indicated�te.�ntract Documents. <br />H. CONTRACTOR has correlated t infor'm��ation known to CONTRACTOR, information <br />and observations obtained from visits.to the,Site, reports and drawings identified in the <br />Contract Documents, and all\additional examinations, investigations, explorations, <br />tests, studies, and data with the Contract Document`s <br />I. CONTRACTOR has given -E NG. I,NEERvuritten notice of all conflicts, errors, ambiguities, <br />or discrepancies that CONTRACTOR\has discovered in the Contract Documents, and <br />the written resolution thereof'by ENGINEER is acceptable to CONTRACTOR. <br />The Contract DO& <br />of alkterms andKcoi <br />9 -CONTRACT <br />MIS <br />A. The Contract <br />are generally sufficient to indicate and convey understanding <br />'for performance and furnishing of the Work. <br />nts consist of the following: <br />1. This Agreemeht (pages 00520-1 to 00520-10, inclusive); <br />2. Notice to Proceed (page 00550-1); <br />3. Public Construction Bond (pages 00610-1 to 00610-3, inclusive); <br />4. Sample Certificate of Liability Insurance (page 00620-1); <br />5. Contractor's Application for Payment (pages 00622-1 to 00622-6 inclusive); <br />6. Certificate of Substantial Completion (pages 00630-1 to 00630-2, inclusive); <br />7. Contractor's Final Certification of the Work (pages 00632-1 to 00632-2, inclusive); <br />196 <br />